Similar Projects
Eastlake Layover Facility
New Construction
Conception
$10,000,000 est. value
WA

West Duwamish CSO Storage
New Construction
Conception
$32,000,000 est. value
WA

21 Boston Mixed Use Development
New Construction - 273,000 SF
Design
Seattle, WA 98109

Design Build MATOC
New Construction, Renovation
Design
Less than $4,000,000 est. value
Boise, Orofino, ID - Colton, Lacrosse, Pasco, Plymouth, Walla Walla, WA 99346

Central Maintenance Facility (Renton Shop)
New Construction
Bidding
$31,707,852 est. value
Renton, WA 98056

NAVFAC Northwest 8(a) Small Multiple Award Construction Contract (MACC) Regional Contract
New Construction, Renovation, Demolition, Alteration
Bidding
$10,000,000 to $100,000,000 est. value

Construction Mac; Pacnorwest
New Construction, Renovation
Post-Bid
$100,000 to $3,500,000 est. value

Construction Mac; Pacnorwest
New Construction, Renovation
Post-Bid
$100,000 to $3,500,000 est. value

GAOA Alt/Repair Construction Services MATOC
Renovation
Results

GAOA Alt/Repair Construction Services MATOC
Renovation
Results

Dutchman Construction
New Construction
Conception
$5,830,000 est. value
WA

Joint Public Safety Facility
New Construction - 9,700 SF
Design
WA

Phase 1.5 A Alterations and Addition
New Construction, Renovation, Addition - 16,356 SF
Bidding
$1,300,000 to $1,500,000 est. value
Wenatchee, WA 98801

Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) Contract(s) for General Construction with Design/Build Capabilities
New Construction
Post-Bid
Less than $500,000,000 est. value

Architectural Services for High School Addition
New Construction, Addition - 15,000 SF
Results
Ridgefield, WA 98642

Reported 05/27/2022 05:31 AM
Project Title

Spokane District Historic Structures Stabilization

Physical Address View project details and contacts
City, State (County) Sprague, WA   (Lincoln County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This requirement is for one (1) Firm Fixed Price Construction contract task order for Historic Building Stabilization, at Folsom Farm Barn (apprx. 30 miles southwest of Spokane, Washington, Rock Ranch Barn (approximately 17 miles south of Creston, Washington. There are optional line items at Lakeview Ranch (located approximately 8 miles north of Odessa, Washington). All buildings will be unoccupied during construction. All work shall be performed in Lincoln County Washington.

Details

Misc. Buildings, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents