Similar Projects
North Main Street Duplexes
New Construction, Demolition - 707,287 SF
Conception
$10,000,000 CJ est. value
Fall River, MA

Rodman Street Townhomes
New Construction - 21,252 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Fall River, MA

Lawton Avenue Units
New Construction - 13,150 SF
Design
Taunton, MA 02780

Bay Street Convenience Store Additions
Renovation - 1,255 SF
Design
Taunton, MA

Elevator Upgrades to Two Traction Elevators
Bidding
$676,000 est. value
New Bedford, MA 02740

Residences at River Edge
New Construction - 33,239 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Fall River, MA 02720

Phase 2 Exterior Building Envelope Repairs at Bates and Tower Apartments
Renovation
Post-Bid
Less than $285,000 est. value
Fall River, MA 02724

Kitchen Modernization Maple Terrace Apartments
Results
$174,000 est. value
Attleboro, MA

Installation of Second Elevator and Heating System Upgrades - General Bids
Renovation
Results
Less than $3,700,000 est. value
Attleboro, MA 02706

The Lowney Chocolate Factory - Apartments and Retail
Renovation - 130,000 SF
Construction
$39,000,000 est. value
Mansfield, MA 02048

Willis Street Apartments
New Construction - 18,412 SF
Construction
$4,500,000 est. value
New Bedford, MA 02740

Brayton Avenue Triplex
Renovation, Addition
Conception
Fall River, MA

Former Reed and Barton Complex Redevelopment
Renovation - 316,322 SF
Design
Taunton, MA

Installation of Second Elevator and Heating System Upgrades - Filed Sub-Bids
Renovation
Results
Less than $3,700,000 est. value
Attleboro, MA 02706

Mechanics Mill Apartments
Renovation - 137,800 SF
Construction
$36,000,000 est. value
Attleboro, MA 02703

Last Updated 12/26/2018 05:47 AM
Project Title

Apartment Conversions at Cardinal Medeiros Towers, Project Ma 6-8

Physical Address View project details and contacts
City, State (County) Fall River, MA   (Bristol County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $270,000
Plans Available from Copy Center - 07/11/18
Owner View project details and contacts
Architect View project details and contacts
Description DCAMM Certificate Required Apartment Conversions at Cardinal Medeiros Towers, Project MA 6-8. Combining of eight (8) Efficiency Apartments, creating four (4) One-Bedroom Apartments on the 14th floor level of the building.
Details
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents