Similar Projects
Appaloosa Woods Area Street Reconstruction
Bidding
Maple Grove, MN

Huntington Farms East and West Area Street Reconstruction
Bidding
Maple Grove, MN

2021 Infrastructure Improvements
Post-Bid
$1,500,000 to $2,000,000 est. value
MN

Grandview South Area Street and Utility Improvements Improvement
Post-Bid
$9,000,000 to $10,000,000 est. value
Brooklyn Center, MN

Vincent Avenue North Sanitary and Storm Sewer
Renovation
Results
Minneapolis, MN 55401

Medina Country Club Sewer Rehabilitation
Results
$108,000 est. value
Medina, MN 55340

Energy Hills, Woodland Ponds, Wintergreen Area Street Reconstruction
Bidding
Maple Grove, MN

Creek Knoll A and B Neighborhood Roadway Reconstruction
Post-Bid
Edina, MN

Pond and Storm Sewer Maintenance
Results
Bloomington, Minneapolis, MN

Excelsior Boulevard Storm Sewer Improvement
Bidding
Minnetonka, MN 55343

2021 Street Reconstruction Project Grading, Base, Bituminous Surfacing, Concrete Curb and Gutter, Storm Sewer and Water Main
Results
Less than $4,600,000 est. value
Plymouth, MN

Ryan Lake Industrial Park Area, Northwest Area & Lyndale Area Mill and Overlay Improvement
Bidding
$2,500,000 to $3,000,000 est. value
Brooklyn Center, MN

Phase 4 Street and Utility
Results
Minneapolis, MN

2021 Glumack Drive Reconstruction
Bidding
MN 55111

2021 Hidden Oaks Lane/Woods Trail/Coneflower Circle Improvement Project
Results
$1,270,000 est. value
Champlin, MN 55316

Last Updated 04/26/2021 09:27 AM
Project Title

Interceptor 1-MN-341 Pipe-in-Pipe Rehabilitation

Physical Address View project details and contacts
City, State (County) MN   (Hennepin County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work of this project includes 1. Install X 4’ and X 8’ diameter maintenance holes in the crown of a 96” storm sewer. 2. Repair exterior CMP defects. 3. Pour a Geoploymer mat over the exterior of the entire CMP segment. 4. Install new access hatches in the CMP for CCTV and jetting equipment access. 5. Clean and televise the interior of the CMP. 6. Repair interior damage if encountered.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents