Similar Projects
Stucco Repairs For Old Atlanta Recreation Center
Bidding
Cumming, Suwanee, GA 30024

Willow Glen Apartments Fire Damage Unit Repairs
Bidding
Columbus, GA 31906

Exterior Staircase
Post-Bid
Greensboro, GA

54--Range Materials
Post-Bid
Fort Benning, GA

Cleaning, Repair and Painting of the Candler County Courthouse Clock Tower
Results
Less than $37,922 est. value
GA

Provide Metal Building Work
Results
Conyers, GA 30012

Gutter Replacement at Three (3) Facilities
Bidding
Cumming, GA 30040

Westmont Elementary Courtyard Security Wall
Post-Bid
Martinez, GA 30907

Fulton County Justice Center Tower Repairs and Alterations to the Exterior Facade
Results
Less than $1,518,198 est. value
Atlanta, GA 30303

Government Center Complex Exterior Painting
Bidding
Macon, GA

Courthouse Roof Replacement and Exterior Stabilization Project
Post-Bid
Monticello, GA 31064

Ringgold Depot Step Demo and Repour
Results
Ringgold, GA 30736

Catoosa County Justice Building Leak Remediation
Bidding
Ringgold, GA 30736

Harmon Field Paint and Handrail Project
Post-Bid
Dalton, GA 30722

Siding Replacement Broadacres Homes
Results
Athens, GA 30601

Last Updated 12/11/2020 09:13 AM
Project Title

Installation of Catwalk

Physical Address View project details and contacts
City, State (County) Sandersville, GA 31082   (Washington County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

For the installation of a 30’ long by 3’ wide catwalk. The catwalk shall be installed at the chlorine contact basin at the City’s Wastewater Treatment Plant located at 1100 Fall Line Freeway Hwy 88, Sandersville, Georgia 31082. 1. Catwalk will be approx. 30’ long x 3’ wide with steps leading in and out each end 2. Walking surface will be 1 ½” thick green fiber grate Catwalk will include handrails and toe plate down both sides 3. All materials will be aluminum and all fasteners or anchors will be stainless steel 4. Catwalk will set on divider walls with a UHMW pad between the aluminum frame and the concrete

Details

Division 05 - Metals, Metal Stairs, Metal Walkways, Metal Catwalks.
Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents