Similar Projects
Furnace and A/C units (2 Locations)
Renovation
Design
Lynnville, IN 47619

Indianapolis International Airport CEP - Boiler Rebuild
Renovation
Sub-Bidding
$400,000 CJ est. value
Indianapolis, IN 46241

Multidisciplinary Eng. and Sci. Hall - MESH - Replace AHU
Renovation
Sub-Bidding
$350,000 CJ est. value
Bloomington, IN 47408

HVAC Renovations to the Lake Prairie Elementary School
Alteration
Post-Bid
$500,000 est. value
Lowell, IN 46356

CEP - Air Compressor Upgrades at the Indianapolis International Airport
Renovation
Post-Bid
$60,000 CJ est. value
Indianapolis, IN 46241

Mechanical Systems Upgrade
Alteration
Results
$300,000 est. value
Muncie, IN

Coliseum Campus Building 2 Rooftop Unit Replacement
Alteration
Results
$779,084 est. value
Fort Wayne, IN 46805

Kingsford Heights Elementary HVAC and Controls Upgrades
Renovation
Construction
$400,000 CJ est. value
Kingsford Heights, IN 46346

Batesville Boiler & Flue Replacement
Renovation
Sub-Bidding
$414,000 CJ est. value
Batesville, IN 47006

EJB R-22 HVAC Unit Replacements
Renovation
Post-Bid
$1,000,000 CJ est. value
Indianapolis, IN 46249

Chiller Replacement at Custer Baker Intermediate School
Alteration
Results
Franklin, IN 46131

HSE High School - Chiller Replacement
Renovation
Sub-Bidding
$432,893 CJ est. value
Fishers, IN 46037

HVAC Renovations at the Lake County Morgue Facility
Alteration
Post-Bid
$400,000 est. value
Crown Point, IN

Harrison High School Auditorium HVAC
Alteration
Results
Evansville, IN 47715

Boiler Replacement at the Edwin Rousseau Centre
Renovation
Sub-Bidding
$380,000 CJ est. value
Fort Wayne, IN 46802

Last Updated 09/28/2023 08:47 AM
Project Title

Technology Center Ebner Hall - HVAC Renovations

Physical Address View project details and contacts
City, State (County) Vincennes, IN 47591   (Knox County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Owner reserves the right to accept or reject any bid or waive any informality or errors in bidding. Bids shall be executed in accordance with the provided bid forms, Certification of NonSegregated Facilities and with Indiana State Board of Accounts Form 96 (revised 2013), a completed AIA Form G705 must be included stating none if there are to be no sub-contractors, and accompanied by a satisfactory bid bond, payable to Vincennes University for not less than 5% of the total bid price. Contractor shall acknowledge all addenda on bid form. Withdrawal of Bid: Should bidder withdraw his bid within 90 days date of opening without written consent of the Owner, the Owner may declare the bid deposit forfeited as liquidated damages. Contract Security: Contractor receiving award shall furnish an approved Performance Bond in an amount of at least equal to 110% of the contract price and also a Labor and Material Payment Bond in an amount at least equal to 110% of the contract price or in a penal sum not less than that prescribed by law; as securities for the faithful performance of the contract and for the payment of all persons performing labor and furnishing materials on this project. Method of Bidding: Contract #1: Mechanical Construction Prime bidders may have two (2) complete sets on a refundable basis if: 1) a responsible bid is received and documents are returned directly to the Office of the Architect in good condition within thirty (30) days of receipt of bids; 2) the prospective bidder notifies the Architect of his/her intention not to bid and returns the bidding documents in good condition at least seven (7) days prior to receipt of bids. Any plan holder not in conformance with Item 1 or 2 noted above will forfeit their plan deposit. Deposits should be made payable to Vincennes University. All bidders must inspect the site for existing conditions. Contact Jeff Weber at 812-888-4037 or Jeffrey.weber@vinu.edu for access to the site.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents