Similar Projects
Beeline Commons
New Construction - 103,036 SF
Conception
$10,000,000 CJ est. value
Jupiter, FL 33478

Prime Corner - Master Plan
New Construction - 45,500 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
West Palm Beach, FL 33401

Sundy Village - Master Plan
New Construction, Build-Out
Design
Delray Beach, FL 33444

575 Rosemary
New Construction - 495,000 SF
Design
$10,000,000 CJ est. value
West Palm Beach, FL 33401

Publix # 1787 at Westlake
New Construction, Build-Out - 59,941 SF
Bidding
$5,000,000 to $10,000,000 CJ est. value
Westlake, FL 33470

Sprouts Farmers Market # 643
Renovation - 23,339 SF
Bidding
Delray Beach, FL 33484

Cornerstone
New Construction, Build-Out, Demolition - 46,120 SF
Sub-Bidding
$12,000,000 est. value
Jupiter, FL 33477

Camino Square
New Construction, Build-Out - 769,021 SF
Post-Bid
$71,818,000 est. value
Boca Raton, FL 33432

Wawa # 5350
New Construction, Demolition - 5,636 SF
Post-Bid
$1,653,000 est. value
Lake Worth, FL 33463

Developer Services
Results
Boca Raton, FL 33431

Boca Beach House Luxury Residences & Marina
New Construction
Construction
$43,312,253 est. value
Boca Raton, FL 33432

Tower 155
New Construction - 390,161 SF
Construction
$37,968,966 est. value
Boca Raton, FL 33432

The Bexly at Boutwell
New Construction - 46,076 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Lake Worth, FL 33461

Wawa
New Construction - 6,119 SF
Conception
$2,500,000 est. value
Boynton Beach, FL 33437

Banyan View
New Construction - 455,000 SF
Design
West Palm Beach, FL 33401

Last Updated 10/06/2021 12:00 AM
Project Title

Catalina at Lake Worth

Physical Address View project details and contacts
City, State (County) Greenacres, FL 33467   (Palm Beach County)
Category(s) Commercial, Residential
Sub-Category(s) Apartments/Condominiums, Supermarket/Convenience Store
Contracting Method
Project Status Construction Commenced February 2021
Bids Due View project details and contacts
Estimated Value $52,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mixed Use. Total sq ft for project not available at this time.

Details

506,000 SF - 20 Apartments/Condominiums, Approximately 25,000 to 35,000 SF New Construction 280 Unit(s), Supermarket/Convenience Store, 1 Story Above Grade, 6,000 SF New Construction, 8 Fuel Pump(s), 30 Acres.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Foodservice Shelving, Food Dispensing Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines.
Division 12 - Furnishings, Countertops, Rugs and Mats, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction, Swimming Pools.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents