Last Updated | 10/05/2023 11:21 AM |
Project Title | Milling, Resurfacing, and Shoulder Reconstruction - US 70 |
Physical Address | View project details and contacts |
City, State (County) | Havelock, NC 28532 (Craven County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected March 2024 |
Bids Due | View project details and contacts |
Estimated Value | $4,075,123 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This work consists of reconstructing each shoulder (including median shoulders as applicable) in accordance with Standard Drawing No. 560.01 and 560.02 of the 2018 Roadway Standard Drawings except that the rate of slope and width will be as shown on typical section, or to the existing shoulder point, whichever is nearer, as long as the desired typical is achieved, and when completed, seeding and mulching. This work shall be performed immediately after the resurfacing operations are complete as directed by the Engineer. This project will require the removal of excess material from the existing pavement by mechanical means prior to paving routes. Excess material generated by clipping excessive shoulder material from the existing pavement will be required to be removed by the Contractor. The Contractor should take care in removing excessive material from the existing pavement to minimize the amount of disturbance to adjacent established vegetation. There will be no direct payment for the removal of any excess material generated from the existing pavement as this work shall be considered incidental to the asphalt pavement line items that correspond with that map. County: Carteret WBS Element No.: 2024CPT.02.01.10161 Route: Various The North Carolina Department of Transportation is requesting bids for the above referenced project. The contractor must furnish all labor, materials, equipment, and any other items necessary for the completion of this contract. The availability date for this project is March 15, 2024. The completion date is December 15, 2025 NC DOT - Milling, Resurfacing, and Shoulder Reconstruction - US 70 |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |