Similar Projects
Repair and Repave Lincoln Drive
Infrastructure
Bidding
$230,000 est. value
Carbondale, IL 62902

PCC Sidewalk, Pipe Culverts, Abutment Construction, and a Pedestrian Truss Superstructure
New Construction, Renovation, Infrastructure - 5,700 SF
Bidding
$4,000,000 est. value
Murphysboro, IL

Central Division - Asphalt Paving Maintenance
Post-Bid

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

Resurfacing and Pavement Markings on Brick Plant Road, from Randolph County Line to IL 4
Results
Campbell Hill, IL 62916

3.7 Miles of Patching, Surface Removal, Surfacing and Ada Ramp Improvements on 14th and 11th Streets in Murphysboro
Results
Murphysboro, IL

HMA Resurfacing, Patching, Ada Improvements and Ditch Re-grading
Infrastructure
Bidding
$4,000,000 est. value
Carbondale, IL

Future Lane Improvements
Infrastructure
Post-Bid
Murphysboro, IL 62966

Pavement Patching on North 6th Street From IL 13/127 to Lucier Street in Murphysboro
Results
Murphysboro, IL 62966

Intersection Reconstruction at the IL 13 / 127 and Resurfacing Along IL13 / 127
Infrastructure
Bidding
$4,000,000 est. value

Road Impovements
Infrastructure
Post-Bid
IL

Pavement Patching at the Intersection of Il 13 and Streigel Road in Carbondale
Results
Carbondale, IL 62901

Reconstruction of New Era Road
Infrastructure
Bidding
$4,000,000 est. value
Carbondale, IL 62902

Maintenance Repair And Construction Electrical
Term Contract, Alteration
Post-Bid
Carbondale, IL

Removal and Reconstruction of Concrete Pavement, Ada Ramp Improvements and Minor Signal Modifications
Infrastructure
Results
IL

Last Updated 05/19/2022 04:57 PM
Project Title

Carbondale Head Start Access Road & Parking Lot

Physical Address View project details and contacts
City, State (County) Carbondale, IL 62901   (Jackson County)
Category(s) Education, Heavy and Highway
Sub-Category(s) College/University, Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $175,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Build an access roadway and new parking lot with striping for the Carbondale Head Start.

Details

College/University, Renovation.
Division 31 - Earthwork, Site Clearing, Grading, Rough Grading, Finish Grading, Excavation and Fill, Excavation, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Base Courses, Cement-Treated Base Courses, Portland Cement-Stabilized Base Courses, Rigid Paving, Concrete Paving, Turf and Grasses, Seeding.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents