Similar Projects
Demetral Park Path - Phase 2
Infrastructure
Bidding
$363,522 est. value
Madison, WI 53704

Hyland Street and East Oak Street Reconstruction
Infrastructure
Bidding
Juneau, WI 53039

Parking Lot Renovation
Post-Bid
Milwaukee, WI 53205

Curb Repair and Street Resurfacing
Post-Bid
De Pere, WI

Boardwalk Replacement
Results
De Forest, WI 53532

Motor Vehicles Storage Compound Expansion
Results
$700,000 est. value
Mosinee, WI 54455

2021 Westview Boulevard Concrete Curb, Pedestrian Path, Concrete/Asphalt Pavement Rehabilitation
Infrastructure
Bidding
WI 54476

Burnham Pointe Park
Post-Bid
Less than $231,532 est. value
West Allis, WI

Menomonee Park DEA Asphalt and Concrete Paving
Results
Menomonee Falls, WI 53051

2021 Sewer and Water Replacement Pearl Street - Wilson to Jefferson
Infrastructure
Bidding
$450,000 est. value
Arcadia, WI 54612

2021 CDBG and CIP Sidewalk Replacement
Post-Bid
Superior, WI

East 9th Street - Street and Utility Improvements
Results
Owen, WI 54460

2021 Dodge County Justice Building Parking Lot Paving
Post-Bid
WI

Great Headwaters Trail 3 and 2
Results
Phelps, WI 54554

Sharon Hall Aluminum Handicap Ramp
Post-Bid
Sharon, WI

Last Updated 07/03/2021 03:11 AM
Project Title

Camp Vits Parking Lot and Trail

Physical Address View project details and contacts
City, State (County) Manitowoc, WI   (Manitowoc County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Camp Vits Park – Parking Lot, Trail, and Privy Preparation: Phase 1 work includes clearing and grubbing trees and brush, addition of fill, new 24” PVC storm culvert, unclassified excavation, grading, new breaker run, new C.A.B.C, along with grading, unclassified excavation and backfilling for a vault toilet which will be installed by others. Also, 650 ft of 10’ wide crushed stone trail shall be constructed through a wooded area. This will be referred to as substantial completion. The second phase of the project will include final grading, 3” HMA pavement and pavement markings along with a gravel shoulder, topsoil and seeding of the parking lot area.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents