Similar Projects
Little Scholars Academy
Renovation - 2,895 SF
Design
Huntersville, NC 28078

Ardrey Kell Rd
Bidding
$1,088,000 est. value
Charlotte, NC

Security Open Options Door Access Maintenance Term Contract
Term Contract
Bidding
Charlotte, NC

WAN Transmission Services
Term Contract
Post-Bid
Charlotte, Davidson, Huntersville, Matthews, NC

Provide, Install, and Maintain A 1 GB End to End Lease Access Circuit between Bldg 7; Rm: Telco; Fl 1; 4930 Minuteman Way Charlotte, Nc 28208 / CCI and Bldg 12; Rm: 143; Fl 1; 39471 Hercules Dr.; New
Post-Bid
Charlotte, NC

To Procure Telecommunications Services and Equipment.
Results

Force Protection Site Security System Solutions (FPS4) Final Request for Proposal (RFP)
Results
$700,000,000 est. value

IT Infrastructure Upgrades - Storrs, Rowe and Reese
Construction
Less than $3,800,000 est. value
Charlotte, NC 28223

Network Equipment
Post-Bid
Less than $100,000 est. value
Charlotte, NC

AV Hardware Integration Services
Results
Charlotte, NC

IT Infrastructure Upgrades
Post-Bid
Charlotte, NC

Radios and Communication Equipment
Term Contract
Results
Charlotte, NC

Union County SCADA Network Architecture
Post-Bid
Charlotte, NC

Little Sugar Creek Greenway and Stream Enhancement Project, I-485 to Polk Street
Results
Pineville, NC 28134

RFI - Home Intrusion Detection Systems
Post-Bid

Last Updated 01/28/2020 01:39 PM
Project Title

Joint Duct Bank Relocation

Physical Address View project details and contacts
City, State (County) Charlotte, NC   (Mecklenburg County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Security/Communications, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 to $400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project site is located at the southeast corner of the intersection of North Tryon Street and Institute Circle on the edge of the campus of UNC Charlotte. The work includes lowering approximately 117 feet of an existing telecommunications duct bank and its laterals at least 3 feet below the final sidewalk grade, as well as lowering seven existing hand-holes to match the elevation of the back of the final sidewalk. The duct bank in question contains active communications lines owned by CDOT, Century Link, MCI/Verizon, MCNC, Spectrum and Windstream. The work also includes removal of an existing retaining wall, removal and replacement of the existing sidewalk, fine grading, erosion control, traffic control and restoration of the work limits to their original condition.

Details

Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents