Similar Projects
Heat Pumps for the Community Building
Alteration
Bidding
North Haven, ME

HVAC Contract Services
Alteration
Bidding
Brunswick, ME

Design - Build Noise Controls for a Trane Screw Chiller
Post-Bid
South Portland, ME

Repair Fire Suppression Hood - Dexter, ME
Post-Bid
Dexter, ME

Building K & D HVAC Project at DDPC
Results
Less than $800,000 est. value
Bangor, ME

SJC HVAC Upgrades at the Cumberland County Courthouse
Results
Less than $200,000 est. value
Portland, ME 04101

Ductless Split Air Conditioning System
Alteration
Bidding
Sanford, ME 04073

Replacement of 154 Existing PTAC Units
Post-Bid
Brunswick, ME 04011

HVAC Upgrade at Western Avenue Fire Station
Results
South Portland, ME

Hvac Preventative Maintenance and Repair Work in Region 5/Located in Various Locations in the Counties of Washington, Penobscot and Aroostook
Alteration
Bidding

HVAC Service
Term Contract
Post-Bid
Brunswick, ME 04011

Lewiston Public Works Chiller Repairs
Results
Lewiston, ME

Replacement of the Freezer/Cooler at Alfond Student Center
Post-Bid
Castine, ME 04420

HVAC Repair Space Optimization & Renovation PNSY-B43
Renovation
Results
$1,000,000 to $5,000,000 est. value
Kittery, ME 03904

Edward T. Gignoux Federal Courthouse HVAC and Fire Alarm Upgrade
Post-Bid
$15,000,000 to $20,000,000 est. value
Portland, ME 04101

Last Updated 10/13/2021 10:00 AM
Project Title

UM DP Corbett HVAC Renovation

Physical Address View project details and contacts
City, State (County) Orono, ME   (Penobscot County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the removal of the existing air-cooled chillers and air handling units and replacement with equal capacity higher-efficiency equipment. It is anticipated that the low bidder will contract with the University of Maine System shortly after the bid and will work on equipment submittals in the fall of 2021 to allow for ordering and fabrication of equipment during the fall and winter of 2021. The anticipated mobilization and start of construction on site will be April 11, 2022; with substantial completion June 3, 2022; and demobilization by June 17, 2022.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents