Similar Projects
Kingman - Wickenburg Highway (Tegner St - Wickenburg Ranch W)
Infrastructure
Bidding
$54,950,000 CJ est. value
Congress, AZ 85332

Concrete Landing and Ramp Replacement Project
Renovation
Sub-Bidding
$359,000 CJ est. value
Shonto, AZ 86054

District Wide Cement Work
Alteration
Post-Bid
Scottsdale, AZ

Concrete Pad and Asphalt Repair Bldg
Infrastructure, Alteration
Post-Bid
Tucson, AZ 85706

DEMA QTR Range Footings - Camp Navajo Single
Results
Bellemont, AZ 86015

Annual Street and Park Concrete FY 21/22
Term Contract
Results
Prescott Valley, AZ

Concrete Repair and Maintenance Services
Term Contract
Post-Bid
Chandler, AZ

Supply or Supply and Deliver Concrete Sand Material
Alteration
Results
Prescott, AZ

Annual Street and Park Concrete Contract FY 22/23
Term Contract
Post-Bid
Prescott Valley, AZ

Tumacacori National Historical Park (Tuma) Requires Services To Reseal Concrete Surfaces Throughout The Park
Term Contract
Results
Tumacacori, AZ 85640

Concrete and Concrete Materials for Aspc Winslow
Term Contract, Infrastructure
Results
Winslow, AZ 86047

Job Order Contracting for Concrete Services
Term Contract, Alteration
Results
$5,000 to $2,000,000 est. value
Kingman, AZ

Landfill Reclaimed Concrete Project
Term Contract
Results
Casa Grande, AZ 85193

Landfill Diesel Fuel Tank/Concrete Pad Replacement Project
Alteration
Results
Casa Grande, AZ 85193

Supply and Deliver Portland Cement Concrete Products
Alteration
Results
Prescott, AZ

Last Updated 09/08/2022 11:36 PM
Project Title

RFP D/B - Intersection Wellfield Pipeline

Physical Address View project details and contacts
City, State (County) Peoria, AZ 85345   (Maricopa County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

With the ongoing drought in the southwest region of the United States and the Colorado River situation, the City of Peoria (City) is anticipating significant reductions to their Central Arizona Project (CAP) water supply in the near future. Peoria's water system, particularly north of Bell Road, is heavily dependent on receiving water from the CAP and any reductions could have significant impact on development in north Peoria. Peoria Water Services is actively working to establish water system redundancy for existing and future development utilizing groundwater recovery wells in the event water is not available from the CAP system. Questions Due Date: Jul 19th 2022, 12:00 PM MST

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents