Similar Projects
Gas Regulator Station #15 Replacement
Bidding
Warner Robins, GA

Propane Air Mix Plant Emergency Reserve
Post-Bid
Robins Afb, GA

Renovations To Wastewater Treatment Pond
Post-Bid
Forsyth, GA 31029

Relocate Fuel Farm
Results
Clarkesville, GA

SR 316 at Harbins Road Natural Gas Relocation
Results
Less than $948,610 est. value
Buford, GA

2020 Natural Gas Reliability Upgrades
Post-Bid
Dalton, GA 30721

Natural Gas Pipeline to Serve Belmont S/D
Results
Social Circle, GA

Metering Infrastructure Equipment And Meters
Post-Bid
Cartersville, GA

Natural Gas Pipeline to Serve the Oaks at Alcovy S/D
Results
Social Circle, GA

Natural Gas Main Replacement
Post-Bid
Monroe, GA 30655

High Pressure Gas Main Extension Houston Lake Road
Results
Perry, GA 31069

Jet Fuel Truck Tank/Pump Assembly Removal, Refurbish, and Re-Installation
Post-Bid
Dalton, GA 30720

Fuel Farm Installation
Results
Less than $159,875 est. value
Woodbury, GA

Fuel Management System Upgrade
Post-Bid
Dublin, GA

Gas Main Installation
Results
Commerce, GA 30529

Last Updated 04/02/2020 07:49 AM
Project Title

Steel Pipe 6 Foot Expansion - Provide and Deliver

Physical Address View project details and contacts
City, State (County) Cartersville, GA 30120   (Bartow County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

20,300 L.F. – 6-5/8" O.D.-.250" W.T., F.B.E. Coated, ERW X52 Steel Line Pipe 1,110 L.F. – 6-5/8" O.D.-.280" W.T., F.B.E./2040 Coated, ERW X52 Steel Bore Pipe

Details

Division 33 - Utilities, Natural-Gas Distribution, Natural-Gas Piping.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents