Similar Projects
Lifecycle Replacement 750-Ton Chiller
Alteration
Bidding
Savannah, GA 31405

Science Center Boiler Replacement
Alteration
Bidding
Savannah, GA 31419

Beck Valves Parts and Ancillary Services
Term Contract
Post-Bid
Atlanta, GA

Walk In Cooler and Freezer
Post-Bid
Milledgeville, GA 31061

Petit Science Center Boiler 2 Burner Retrofit
Results
Atlanta, GA 30303

Submersible Pump
Results
Rome, GA 30162

Chiller Maintenance and Repair Services
Alteration
Bidding
Augusta, GA 30906

Ellijay Elementary Walk-In Cooler
Post-Bid
Ellijay, GA 30540

Myers Middle School Boiler and Pumps Replacement
Results
Savannah, GA 31404

New Replacement Boiler and Proper Regulation and Management for the Existing Steam Distribution
Alteration
Bidding
Toccoa, GA 30577

HVAC and Mechanical Maintenance Service
Term Contract
Post-Bid
Cartersville, GA

Boiler Replacement at Hightower Library
Results
$95,000 to $150,000 est. value
Barnesville, GA 30204

Boiler Replacement at Melton Hall
Alteration
Bidding
$400,000 est. value
Barnesville, GA 30204

Replace Boiler and Cooling Tower at Douglass High School
Post-Bid
Atlanta, GA 30318

Administrative Center Mechanical and Roof Improvements
Results
Atlanta, GA 30339

Reported 04/01/2022 12:00 AM
Project Title

GHC Heritage Hall Boiler Project

Physical Address View project details and contacts
City, State (County) Rome, GA 30161   (Floyd County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $150,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The intent of the Heritage Hall Campus Boiler Replacement project is to replace two (2) 1.5 million BTU non-condensing boilers with one (1) 2 million BTU condensing boiler, to be located in the basement mechanical room of the Heritage Hall building, Rome Campus at Georgia Highlands College. Additionally, the scope includes the removal of the existing boiler pumps and heating hot water circulating pump for the building, as well as associated accessories. The room supply fan will be removed and existing pumps will be replaced with new equipment to facilitate the new boiler operation. This work is scheduled to be completed in one phase of construction.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents