Similar Projects
Fort Collins Nissan Auto Dealership
New Construction, Renovation - 40,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Fort Collins, CO 80525

Carvana Tower
New Construction - 5,790 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Denver, CO 80222

Firestone Complete Auto Care
New Construction
Design
Falcon, CO 80831

Sill Terhar Mazda
New Construction, Demolition
Design
Broomfield, CO

Red Rock Service & Administrative Building
New Construction
Sub-Bidding
Grand Junction, CO

CarMax #7201
Renovation, Addition - 6,827 SF
Post-Bid
Colorado Springs, CO 80922

Love's #337 Back Room Cooler and Deli
Renovation, Build-Out - 10,969 SF
Post-Bid
Less than $500,000 est. value
Hudson, CO 80642

Central Maintenance Facility
Renovation
Results
Aurora, CO 80018

Jiffy Lube #4003
New Construction - 3,438 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Greeley, CO 80634

Mike Shaw Subaru
Renovation - 28,639 SF
Construction
Denver, CO 80234

Strickland Brothers 10 Minute Oil Change
New Construction - 1,455 SF
Pending Verification
Less than $500,000 CJ est. value
Aurora, CO 80011

MHC Kenworth South Denver
New Construction - 42,345 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Englewood, CO 80112

2 Mazda - Loveland
New Construction
Post-Bid
Loveland, CO 80538

Brakes Plus - Colorado Springs
New Construction - 4,839 SF
Construction
$1,000,000 est. value
Colorado Springs, CO 80951

Truck Wash and Parking Expansion
Renovation - 16,948 SF
Conception
Denver, CO 80234

Reported 05/19/2022 12:00 AM
Project Title

Red Rock Nissan Dealership

Physical Address View project details and contacts
City, State (County) Grand Junction, CO   (Mesa County)
Category(s) Commercial
Sub-Category(s) Vehicle Sales/Service
Contracting Method General Contractor to Subcontract.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

1 Nissan Showroom. 1 Kia Showroom.

Details

79,411 SF - 1 Vehicle Sales/Service, 2 Stories Above Grade, 59,701 SF New Construction, 1 Vehicle Sales/Service, 1 Story Above Grade, 9,189 SF New Construction, 1 Vehicle Sales/Service, 1 Story Above Grade, 10,521 SF New Construction.
Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Office Accessories, Rugs and Mats, Office Furniture, Interior Planters and Artificial Plants.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents