Similar Projects
Woodfield Area Apartments
New Construction, Addition
Conception
$90,000,000 est. value
Schaumburg, IL 60168

Arlington Heights 425 Mixed Use
New Construction - 15,500 SF
Design
$150,000,000 est. value
Arlington Heights, IL 60005

Downtown Towers
New Construction, Demolition - 41,000 SF
Design
$350,000,000 est. value
Chicago, IL 60605

Cassidy Place Mixed Use
New Construction
Post-Bid
$139,000,000 est. value
Chicago, IL 60654

2021 Roof Repairs at MAC Arthur Middle School
Post-Bid
Prospect Heights, IL 60070

Roof Replacement at Chippewa School
Results
Palos Heights, IL 60463

2021 Roofing Work at Various Schools
Results
Buffalo Grove, Elk Grove Village, Rolling Meadows, IL 60089

1000M Mixed Use Development
New Construction - 50,000 SF
Construction
$470,000,000 est. value
Chicago, IL 60605

Ally Life Science Building
New Construction - 320,000 SF
Construction
$10,000,000 est. value
Chicago, IL 60614

1150 West Lake Street Mixed Use Development
New Construction, Demolition - 47,000 SF
Pending Verification
$300,000,000 est. value
Chicago, IL 60642

Halsted Point Mixed Use
New Construction - 2,700,000 SF
Pending Verification
$5,900,000 est. value
Chicago, IL 60642

Fulton Market Mixed Use Development
New Construction - 393,000 SF
Design
$250,000,000 est. value
Chicago, IL 60607

Replace Shingled Roofing Systems
Post-Bid
$3,500,000 est. value
Chicago, IL

2021 Roof Replacement
Results
Wheeling, IL 60090

West Erie Street Planned Development & Community Shopping District
New Construction - 20,450 SF
Construction
Chicago, IL 60654

Last Updated 07/21/2022 07:32 AM
Project Title

Public Works Garage Roof Replacement

Physical Address View project details and contacts
City, State (County) Tinley Park, IL 60477   (Cook County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Parking Garage, Roofing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This work shall include the following: Partial roof replacement, as further described within the specifications and drawings. The Work shall be substantially completed by December 1, 2022, pending material availability. (Project includes a Material Price Change Allowance. See Project Documents for Additional Information)

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 10 - Specialties, Signage, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 21 - Fire Suppression.
Division 26 - Electrical, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents