Similar Projects
RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Asphalt Resurfacing
Infrastructure
Post-Bid
$746,340 CJ est. value
Manchester, KY 40962

Asphalt Resurfacing
Infrastructure
Post-Bid
$746,340 CJ est. value
Manchester, KY 40962

Asphalt Rehab Interstate/Parkway - Daniel Boone Parkway (Pw 9006)
Infrastructure
Results
KY

Asphalt Resurfacing- Barcreek - Oneida (Ky 66) (Mp 28.379)
Infrastructure
Results
KY

Pavement -Hal Rogers Parkway ( Hr 9006) (Mp 10.593)
Infrastructure
Results
KY

CR 1298 and CR 1056-Bridge Replacement
Infrastructure
Results
KY

Manchester - Hyden Road (US 421) - Pavement
Infrastructure
Results
KY

ELK Mountain Road (Ky 873) - Pavement
Infrastructure
Results
KY

Asphalt Resurfacing - KY 472
Infrastructure
Results
$300,000 est. value
Manchester, KY

Asphalt Resurfacing - KY 2440
Infrastructure
Results
$300,000 est. value
Manchester, KY 40962

Asphalt Resurfacing - KY 3560
Infrastructure
Results
$300,000 est. value
Manchester, KY

Asphalt Resurfacing - Oneida - Taft (KY 11)
Infrastructure
Results
$600,000 est. value
Oneida, KY 40972

Clay County High School Area Technology Center Phase 1 - Mass Earthwork
Infrastructure
Results
$2,940,000 CJ est. value
Manchester, KY 40962

Oneida Water Storage Tank Rehabilitation
Infrastructure
Results
$274,390 CJ est. value
Manchester, KY 40962

Last Updated 02/17/2023 07:44 AM
Project Title

Upgrade Route from Somerset to Hazard to Interstate Standards

Physical Address View project details and contacts
City, State (County) Manchester, KY 40962   (Clay County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2026
Bids Due View project details and contacts
Estimated Value $98,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Upgrade Route From Somerset to Hazard to Interstate Standards: 4 Lane from Clay/Laurel Line to Manchester (Just Past Exit 20 at Bridge over KY 80/US 421), MP 10.593 to MP 21.498 (Segment 7). (16CCN)(18CCN) Milepoints: From: 10.593 To: 28.4 Purpose and Need: Reliability / Major Widening(O) As of February 17, 2023, the project is in conceptual status. Anticipated Letting Year is 2026. KYTC - Upgrade Route from Somerset to Hazard to Interstate Standards *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents