Similar Projects
Construction of Sidewalk on Hagood Street
Infrastructure
Bidding
$659,000 est. value
Mountain Brook, AL 35213

East Street Sidewalk Project
Post-Bid
Vestavia Hills, AL 35216

410 Building Demolition and Express Lot 4 Expansion
Demolition
Post-Bid
$1,900,000 to $2,000,000 est. value
Birmingham, AL 35233

New County Road 13 Sidewalks - Sedgefield to Manley Road Soccer Complex
Results
$480,000 to $520,000 est. value
Fairhope, AL

Multi-Use Recreational Trail Expansion along SR-1 (US-431)
Results
$1,500,000 to $2,000,000 est. value
Guntersville, AL 35976

Construction of Sidewalks on Dunbarton Drive
Post-Bid
Less than $433,000 est. value
Birmingham, AL 35213

Parking Lot Fultondale High School
Results
Less than $949,900 est. value
Birmingham, AL

West Lagoon Avenue Multi-Use Path and Resurfacing Project - FY 2020
Post-Bid
Gulf Shores, AL

Coliseum Parking Lot - Asphalt Pavement Patching and Repairs (Phase II)
Results
Auburn, AL

Stegall Hall Upper and Lower Parking Tiers Reseal and Stripping
Post-Bid
Enterprise, AL

Resurface Existing Recycled Tire Walking Track
Results
Less than $139,787 est. value
Montgomery, AL 36130

Crane Avenue Sidewalk
Post-Bid
Anniston, AL 36201

Alabama City Center Parking
Results
Gadsden, AL 35902

Parking Lot Improvements
Post-Bid
Montgomery, AL

Phenix City Riverwalk
Results
Phenix City, AL

Last Updated 06/16/2021 07:50 AM
Project Title

2020 CDBG Sidewalk Project - Haven Drive Extension

Physical Address View project details and contacts
City, State (County) Dothan, AL   (Houston County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project work consists of clearing, grubbing, grading and compaction of existing city right of ways; laying concrete sidewalks, curbs and pedestrian handicap ramps, miscellaneous steel, thermoplastic crosswalk stripping, dress up, topsoil and grassing, including all incidental labor and materials necessary for paving concrete sidewalk.

Details

Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents