Similar Projects
Install Pumpstation near Bldg 160 and Grade & Pave Parking Lot at Bldg 159
New Construction
Design
$1,000,000 to $5,000,000 est. value
Rock Island, IL

Prairie Street Lift Station
Bidding
Toulon, IL 61483

CLCJAWA Secondary Water Delivery Structure and Grayslake Water Metering Station
Renovation
Bidding
Grayslake, IL

Levee 37 Pump Station Upgrade (USACE Acquisition)
Post-Bid
$1,000,000 to $5,000,000 est. value
Mount Prospect, IL

Low Lift Pump
Post-Bid
Winnetka, IL

Check Valve Replacement
Results
Gurnee, IL 60031

Lift Station Upgrade
Results
$25,000 to $50,000 est. value
Greenup, IL 62428

7th Avenue Pump Station
Construction
Less than $1,250,000 est. value
Mendota, IL 61342

Storm water pump station rehab at the 25th Street Pump Station
Infrastructure
Bidding
IL

Mount Prospect Golf Club Irrigation Pump Station Replacement
Post-Bid
Mount Prospect, IL 60056

Force Main Improvement - Lift Station 23 and 25A
Results
Edwardsville, IL 62025

Anthracite Filter Media Bid 2021-2022
Term Contract
Bidding
Waukegan, IL

Check Valve Replacement
Renovation
Post-Bid
Gurnee, IL 60031

Oswego Pump Station Phase 2 Improvements
Results
Oswego, IL 60543

High Lift Pump 7 Replacement
Renovation
Post-Bid
Northbrook, IL

Last Updated 05/20/2021 05:20 PM
Project Title

Ottawa River Crossing Sanitary Lift Station Facility

Physical Address View project details and contacts
City, State (County) Ottawa, IL 61350   (La Salle County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,500,000 to $4,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Multi-level masonry & concrete building of approximately 1,500 square feet. Work will consist of site work, concrete work, masonry, metals, thermal and moisture protection, doors, windows, specialties, mechanical, plumbing, electrical and specialty sanitary lift station equipment and additional work as needed.

Details

Lift and Pump Stations, 1,500 SF New Construction.
Division 02 - Existing Conditions, Demolition, Structure Demolition, Building Demolition.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 41 - Material Processing and Handling Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents