Similar Projects
Udot AVL (Approved Vendor List)- Hot Mix Asphalt
Term Contract
Bidding

Udot AVL (Approved Vendor List)- Hot Mix Asphalt
Term Contract
Bidding

Parleys Way Crosswalk Enhancements and Pedestrian Safety Improvements
Post-Bid
Salt Lake City, UT 84114

Grinding for UDOT
Term Contract
Post-Bid
UT

2020 Crack Seal
Results
Less than $100,000 est. value
Riverton, UT 84065

2020 Overlay
Results
Riverton, UT 84065

Taylorsville Regional Trail 5140 So to 5400 So Transportation Alternatives
Infrastructure
Bidding
$500,000 est. value
UT

Mendon Cemetery Expansion Phase 1A - Roadway
Post-Bid
Logan, UT 84325

2020 Slurry Seal Project
Results
$250,000 to $300,000 est. value
Riverton, UT

Udot Region 4 Wash Rack Installation Various Locations
Term Contract, Infrastructure
Bidding

2020 Shoulder Improvements
Post-Bid
Sandy, UT 84070

Old Liberty Way (4050 West: 13400 South to 13200 South) Roadway Project
Results
$2,500,000 to $3,000,000 est. value
Riverton, UT 84065

UDOT Asphalt Pavement Repair US189 MP 26.7 WB
Term Contract, Infrastructure
Bidding
Salt Lake City, UT

Highland Drive Widening and Reconstruction
Post-Bid
Draper, UT 84020

Roadway Reconstruction 300 West (1000 North to North Temple) Sewer Rehabilation
Results
Less than $1,993,446 est. value
Salt Lake City, UT 84104

Last Updated 07/08/2021 01:35 PM
Project Title

CCSD Parking Lot Projects 2021 - Group 1

Physical Address View project details and contacts
City, State (County) Hyrum, Nibley, South Salt Lake, UT 84319 (Cache, Salt Lake Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide lump sum bids for Seal Coating, Crack Sealing, Re-striping and some minor asphalt replacement as per drawings and specifications. All barricading and protection are required to be provided by the Subcontractor. These projects will begin June 1,2021 and will occur through August 13, 2021. Contract A: Canyon Elementary School. Contract B: Mountain Crest High School. Contract C: South Cache Middle School. Contract D: Lincoln Elementary School. Contract E: Heritage Elementary School.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents