Similar Projects
Timber Bluffs Acres Phase I and II
New Construction
Conception
Eau Claire, WI 54701

Madison Chocolate Company
Build-Out, Alteration - 3,125 SF
Design
Madison, WI 53719

Repair Sidewalks / Install Pull-out Lane Project
Alteration
Design
$25,000 to $100,000 est. value
Tomah, WI 54660

Hodag Park Music Gazebo
New Construction, Infrastructure - 220 SF
Bidding
$260,000 est. value
Rhinelander, WI 54501

Towers Parking Lot Reconstruction - GPC
Infrastructure
Bidding
$1,000,000 est. value
Eau Claire, WI 54701

Timeless Timber Site Commercial Redevelopment
Post-Bid
Ashland, WI 54806

Refrigerator/Freezer Install/Remove/Replace
Term Contract
Post-Bid
Racine, WI 53402

Parking Lot
Results
Milwaukee, WI 53205

Dunning Street, Jackson Street and Lafollette Avenue Reconstruction Assessment District - 2020
Results
Less than $4,034,805 est. value
Madison, WI 53704

13 Lot Single Family Sub Division
New Construction
Construction
Mequon, WI 53097

Biosolids Drying, UV Disinfection and WPCF Upgrades
Infrastructure
Bidding
Beloit, WI

Veterans Memorial Field South Softball Field Site Redevelopment
Post-Bid
Portage, WI 53901

2021 Street Projects 47
Results
Less than $2,000,000 est. value
Oconomowoc, WI

2022 Roadway Program
Infrastructure
Bidding
$1,600,000 est. value
Hales Corners, WI

Sidewalk and Curb Replacement
Post-Bid
$5,000 est. value
Winter, WI 54896

Last Updated 02/14/2022 02:57 AM
Project Title

Blanchardville - Dane County Line, STH 78 - STH 3

Physical Address View project details and contacts
City, State (County) WI   (Iowa County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Excavation, Rock Excavation, Marsh Excavation, Base, HMA Pavement, Curb and Gutter, Pavement Marking, Signs, Culvert Pipe, and Storm Sewer, Excavation Common, 55,190 CY; Excavation Rock, 1,600 CY; Excavation Marsh, 2,100 CY; Borrow, 45,785 CY; Base Aggregate Dense, 87,950 Ton; Select Crushed Material, 6,200 Ton; Breaker Run, 33,110 Ton; Construction Staking, 96,610 LF; Construction Staking, 39 Each; Construction Staking, 2 LS; Culvert Pipe, 538 LF 18”, 1,016 LF 24“, 116 LF 30“, 6 LF 24“; Storm Sewer Pipe, 465 LF 12“, 1,354 LF 24“; Storm Sewer / Culvert Pipe Horizontal Elliptical or Pipe Arch, 78 LF 35” X 24”, 82 LF 83” X 57”; Concrete Curb and Gutter, 6,920 LF; HMA Pavement, 20,120 Ton; Tack Coat, 4,020 Gals; Signs, 439 SF; Storm Sewer Rock Excavation, 765 CY; Cold Weather Marking Epoxy 4-Inch, 95,950 LF

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents