Similar Projects
Last Updated | 09/06/2022 10:32 AM |
Project Title | RFQ Construction Manager at Risk - Music Addition/Renovation Project North Dakota State University |
Physical Address | View project details and contacts |
City, State (County) | Fargo, ND 58105 (Cass County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | College/University, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Request for Qualifications, Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $1,700,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | **As of September 06,2022, this project has not yet been awarded. A timeline for award has not yet been established.** Request for Qualifications Construction Manager at Risk For Music Addition/Renovation Project North Dakota State University North Dakota State University requests statements of qualifications for construction manager at risk services for the Music Addition/Renovation Project located on the Fargo Campus. Questions regarding the content of the Request for Qualifications submittal instructions are to be directed to the Facilities Management Director, Mike Ellingson (701) 231-7311. The scope of services required by the selected firm shall be as follows: a. Estimating and budget analysis services throughout the design phase based on regular participation in design meeting with the owner, architect, consultants, and in the drawings of the architect and their consultants. This shall include development of an estimated Guaranteed Maximum Price (GMP) at the end of the Schematic Design and Design Development phases of the project. b. Provide a construction schedule throughout design and construction phases. c. Public solicitation and opening of subcontractor bids per N.D.C.C. 48-01.2-22.2, analysis of bids received and recommendations for award of work. d. Determination of the GMP during or upon of completion of the Construction Document phase by the Architect. The CMAR will be required to obtain bids and/or quantify costs for all work so that the GMP amendment may be executed within one week of completion of the Construction Document phase. e. Provide complete and comprehensive construction phase oversight and administration in coordination with the Architect's construction administration services. The contractor's services shall include on-going full-time on-site project supervision, project management and inspection of work, provide collaborative project management computer programs or software for use in coordinating and communicating with owner and design team, review of submittals and shop drawings, preparation of change orders, process pay requests, final inspections, and project close-out documentation. f. Schedule, conduct, and preside over meetings to discuss construction procedures, progress, and scheduling with Owner, each Contractor, and the Architect. Construction Manager shall prepare agendas, meeting minutes, and promptly distribute such to the Owner, Architect, and all meeting participants. g. Coordinate and discuss all contractor change requests for changes in scope and provide recommendations to the Owner concerning the acceptance of change requests to be processed in a change order. Negotiate pricing with contractors, prepare documentation required, and revise project budget and/or schedule to reflect approved change orders. h. Construction Manager shall oversee all safety related activities including but not limited to; conducting safety meetings, performing work site safety assessment inspections, recordkeeping, and pre-construction safety audits. i. Recommendations regarding materials and construction feasibility throughout the design phase |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |