Similar Projects
Last Updated | 08/05/2022 02:04 PM |
Project Title | Manmiller/Temple Project - Streambank Protection |
Physical Address | View project details and contacts |
City, State (County) | Temple, PA 19560 (Berks County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Park/Playground, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $86,975 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | **As of August 5, 2022, project was awarded to Ecotone Inc., awarded amount is $86,975.08** The primary scope of work for this project includes improving Laurel Run alignment and culvert entrance flow conditions with debris removal and installing (2) R-6 Rock barbs at the Temple Playground park access road (Part A). Also, grading and stabilizing the streambank (Part B) at a private residence with a 8' height stacked rock wall. Deposition removal to within 6" of water level is required in both parts in areas shown on the drawings. Deposition, debris, and any excess excavation within the Contractors work area shall be disposed of offsite. CLARIFICATION DEADLINE 7/7/2022 12:00 AM *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The project value range is $45,000 to $55,000 |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |