Similar Projects
Turner Brewer Septic and WPS
Alteration
Design
$25,000 to $100,000 est. value
Roy, WA

Foothills Trail - East Puyallup Trail Head Expansion - 3240 - Pierce County
Infrastructure
Design
Tacoma, WA

I-5, Mounts Road to Steilacoom - DuPont Road - Corridor Improvements
Infrastructure
Bidding
$165,000,000 to $195,000,000 est. value
WA

24th Street East Utility Relocation
New Construction, Infrastructure
Bidding
$3,000,000 to $3,750,000 est. value
Sumner, WA 98352

West Side of Phillips Rd SW Sidewalk
Infrastructure
Post-Bid
Lakewood, WA

ASOG Complex
New Construction, Infrastructure - 71,600 SF
Post-Bid
$10,000,000 to $25,000,000 est. value
Camp Murray, WA

SR 167,I-5 to SR 509 - New Expressway
Infrastructure
Results
$325,000,000 to $375,000,000 est. value
WA

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Mercy Housing Affordable Senior Development
New Construction - 43,000 SF
Construction
$1,849,000,000 est. value
Tacoma, WA 98405

Summit Avenue Water Main Replacement
Infrastructure
Bidding
$300,000 est. value
Fircrest, WA 98466

112th Street Southwest Water Main Replacement
Infrastructure
Post-Bid
$757,255 est. value
Lakewood, WA 98499

Nisqually State Park Maintenance Building Phase 1
New Construction, Infrastructure, Alteration
Results
$1,289,979 est. value
Eatonville, WA 98328

Traffic Curb Improvements
Infrastructure
Bidding
$300,000 est. value
Bonney Lake, WA 98391

39th Avenue Southwest Phase 4 Halcyon Water Main Replacement
Infrastructure
Post-Bid
$388,000 est. value
Lakewood, WA 98499

Puyallup Avenue Transit - Street Improvements
Infrastructure
Results
$100,000 est. value
Tacoma, WA

Last Updated 06/02/2022 11:51 PM
Project Title

Town Center - Utility and Woonerf Project

Physical Address View project details and contacts
City, State (County) Sumner, WA   (Pierce County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $6,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of existing water mains and services at Kincaid Avenue, Alder Avenue, Park Street, and Academy Street in Sumner, Washington. The project includes erosion control, installation of new water mains and appurtenances, water services, hydrants, sampling stations, and connection to existing mains, as well as paving, sidewalks, construction of ADA curb ramps, and new catch basins for storm connections on the streets listed above and on portions of Main Street, Cherry Avenue, and Maple Street, all in accordance with the Contract Plans, the Contract Provisions, and the Standard Specifications.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents