Similar Projects
Hayes Run Bridge Box
Infrastructure
Conception
$743,748 CJ est. value
Potter Township, PA 16828

Hayes Run Bridge Box
Infrastructure
Conception
$743,748 CJ est. value
Potter Township, PA 16828

West College Avenue Mixed-Use Building
New Construction, Infrastructure - 15,516 SF
Design
$45,000,000 CJ est. value
State College, PA 16801

West College Avenue Mixed-Use Building
New Construction, Infrastructure - 15,516 SF
Design
$45,000,000 CJ est. value
State College, PA 16801

Benner Pike AVID/Candlewood Dual Brand Hotel
New Construction, Infrastructure - 14,538 SF
Bidding
$5,000,000 CJ est. value
Bellefonte, PA 16823

734 S Atherton Student Housing / State College
New Construction, Infrastructure - 130,000 SF
Post-Bid
$30,000,000 CJ est. value
State College, PA 16801

Atherton Street High Pressure Steam Crossing
Alteration
Post-Bid
$4,000,000 est. value
University Park, PA

East Fairmount Park Project
Infrastructure
Results
$300,000 est. value
State College, PA 16801

T-445 - Milling of Bituminous Paving, Warm Mix Asphalt (WMA) Wearing Course and Asphalt Paving
Infrastructure
Results
$50,000 est. value
Bellefonte, PA

Pugh Street Student Housing Development
New Construction, Infrastructure
Construction
$50,000,000 CJ est. value
State College, PA 16801

Academy Street Stormwater Project Rebid
Infrastructure
Construction
$69,879 CJ est. value
Boalsburg, PA 16827

Environmental Health and Safety (EH and S) Chemical and Radiation Waste Accumulation Facility
New Construction, Infrastructure - 11,000 SF
Pending Verification
$7,200,000 CJ est. value
State College, PA 16803

Bally's Casino Centre County Casino
New Construction, Infrastructure - 94,000 SF
Pending Verification
$120,000,000 CJ est. value
State College, PA 16801

2025 Centre Bridge Preservation
Infrastructure, Renovation
Conception
$3,072,030 CJ est. value
State College, PA 16801

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

Last Updated 10/13/2023 05:04 PM
Project Title

Penns Prairie at Tri-Municipal Park Pavilion, Playground and Pathways (P3) Park Devleopment

Physical Address View project details and contacts
City, State (County) Centre Hall, PA 16828   (Centre County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Landscape Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Question Deadline 10/06/2023 at 4:00 PM ET Questions regarding the Plans and Bid Documents shall be submitted via the "Clarifications" feature in PennBid Tri-Municipal Park, Inc. requests bids for construction at Penns Prairie at Tri-Municipal Park. Penns Prairie at Tri-Municipal Park is a public park serving residents from throughout the region. The scope of work for the Park will include the construction of the following: o Pavilion Structure o Installation of Traditional and Nature Playground o Constructing an ADA Accessible Trail o Gravel Parking Area w/ ADA Accessible Parking Spaces and Accessible Route Penns Prairie at Tri-Municipal Park is a 165-acre public park accessed by Upper Brush Valley Road, west of Centre Hall Borough, in Potter Township, Centre County, PA. The Park construction site is limited to 25 acres in the northeast corner of the park site, and is graphically indicated within the construction documents plan set on sheets 1, 2 and 3. The Contractors and or Subcontractors are required to submit a Contractor's Qualifications Statement and a list of relevant completed projects and references with their bid detailing a minimum of five years of experience in site grading and park, recreation and trail development work. Contractors may bid on all or part of the work outlined in the scope of this project Each Proposal shall be accompanied by a cashiers check, certified check, or bid bond in an amount equal to ten percent (10%) of the total amount of the bid price The anticipated Notice to Proceed date is December 1, 2023. The project shall be completed by May 31, 2024.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents