Similar Projects
Last Updated | 08/29/2022 10:05 AM |
Project Title | Roof Repair For Parks Department |
Physical Address | View project details and contacts |
City, State (County) | Appleton, WI 54913 (Outagamie County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $3,003 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Outagamie County Parks is requesting bids for all materials and labor to repair storm damage to the roof of a steel building located at 1999 East Apple Creek Road in Appleton, WI 54913 Scope of Work This is a Cleary building with white standing seam 36" wide steel panels with 9" rib spacing and 3/4 " rib thickness. We are requesting replacement of 7 panels and panel length to be determined by contractor. Approximately 20' of manufacturer fabricated rake trim was also damaged and will need to be replaced. Colors are to match as closely as possible. Three structural purlins appear to have cracked from a fallen tree and will need to be replaced in the damage area. The purlins are 2"x 6"x 12' Referenced the attached document with pictures of the building. Bid will be lump sum base bid Completion A PO will be issued by end of day April 29 th . The Contractor shall achieve final completion by 3:00 pm CT July 1, 2022. Failure to achieve final completion by July 1 st willresultin a $50 per calendar day liquidated damages penalty. References Include a minimum of three and a maximum of five references for similar projects your company has completed in the past five years. Include company name and location and contact name and phone number. If you have been directly hired by the County (not as a sub) in the past three yearsfor a similar project you do not need to include references and you could list the project on the Bid Form. Owner's Right to Stop Work If the contractor failsto correct Work which is not in accordance with the requirements of this RFB or fails to carry out Work in accordance with RFB, the County may issue a written order to the Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however,the right ofthe County to stop Work shall not give rise to a duty on the part of the Owner to exercise thisright forthe benefit of the Contractor or any other person or entity. Owner's Right to Carry Out Work If the Contractor defaults or fails or neglects to carry out the Work in accordance with the RFB, or failsto perform a provision of the RFB, the County, after 10 days' written notice to the Contractor and without prejudice to any otherremedy the County may have,maymake good such deficiencies and may deduct the reasonable cost thereof. Including County's expenses and compensation forthe Architect'sservicesmade necessary thereby, from the payment then or thereafter due the Contractor |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |