Similar Projects
Long-Term Parking Expansion: Pavements, Drainage & Lighting
Alteration
Bidding
$1,500,000 to $2,000,000 est. value
Traverse City, MI

Burger Baylor Gutters Replacement
Infrastructure
Bidding
MI

Michigan Memorial Phoenix Project Laboratory Building Number 1000404 Refurbish Sidewalk Lift and Adjacent Concrete Bidpack 01 - Construction
Post-Bid
Ann Arbor, MI

ADA Sidewalk Replacements
Post-Bid
Muskegon, MI

Concrete Repair Contract 2019
Results
Okemos, MI 48864

2019 Parking Lot Rehabilitation - Administration Parking Lot
Results
Mason, MI

Fiedler Elementary Parking Expansion Acoustic Panels/Painting
Post-Bid
Flint, MI

Blueberry Park Parking Lot Improvements
Results
Montrose, MI

2020 Asphalt Parking Lots and Drives Crack Filling, Sealcoating and Line Striping
Post-Bid
Midland, MI

OCC Southfield Parking Lot Repairs
Results
Southfield, MI 48075

Sidewalk Replacement and Repair - 2020
Post-Bid
Ypsilanti, MI

Concrete Sidewalk, Ramps, Curb and Gutter, Drainage and Pavement Markings
Results
Kingsford, MI 49801

Lowe's Parking Lot Rehabilitation
Renovation
Post-Bid
Big Rapids, Canton, Fort Gratiot, Gaylord, Holland, Muskegon, Rochester Hills, Southgate, Sterling Heights, Warren, Ypsilanti, MI

North Cedar Crest Apartments, Driveway Replacements
Results
Less than $38,600 est. value
Gladwin, MI

Monroe Street Frontage Improvements
Post-Bid
Hillsdale, MI

Reported 07/13/2021 12:00 AM
Project Title

Drummond Island East Marble Head Orv Trail Improvements

Physical Address View project details and contacts
City, State (County) MI   (Chippewa County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT LOCATION (work site) T41N, R07E, Sec 1, East Marble Head Trail Work to be completed under this contract includes furnishing all labor, materials, and equipment to: Shape an 8’ wide trail, place filter cloth, haul and place 0” to 12” bank run aggregate about 6” deep for approximately ½ mile and related items at the Drummond Island East Marble Head Trail.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents