Similar Projects
Last Updated | 11/18/2021 08:39 AM |
Project Title | Chemical Metering Pump Upgrades at the Shaft-10 Pump Station Facility |
Physical Address | View project details and contacts |
City, State (County) | Tarrytown, NY (Westchester County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Pumps and Wells |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Contract consists principally of the following items of work, but is not necessarily limited to: 1. Removal of all existing chemical injection pumps and feed panel for the Sodium Hypochlorite, Caustic, and Orthophosphate and replace it with new Watson-Marlow Qdos-20 peristaltic chemical injection metering pumps and pump pods. 2. All piping and tubing, including equipment and metering pumps, between Day Tanks and Chemical Injection location, including injection quills, shall be removed and replaced with new, as per the proposed layout plan. |
||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |