Similar Projects
Somers Sanitation Transfer/Recycling Facility Improvements
New Construction
Design
Somers, NY 10589

Brookview Village - Expansion Phase III
Infrastructure
Design
$500,000 to $1,000,000 est. value
Greenfield Center, NY 12833

Provide Wastewater Treatment Plant Improvements, Building 92 - Construction
Renovation
Bidding
$9,000,000 to $10,000,000 est. value
Bedford Hills, NY 10507

Onsite Wastewater Treatment Systems
New Construction
Bidding
NY

Z--Renovate Sewage Treatment Plant Trickling Filter at Castle Point
Renovation
Post-Bid
$1,000,000 to $5,000,000 est. value
Wappingers Falls, NY 12590

Screening and Grit Transport Equipment Improvements, Polymer Equipment Upgrades and Dewatering Equipment Control Upgrades
Post-Bid
Niagara Falls, NY 14304

Construction of Phase II Digester Improvement
Results
Syracuse, NY 13202

Z1DA--Renovate Sewage Treatment Plant Trickling Filter at Castle Point VA Medical Center
Renovation
Results
$1,000,000 to $5,000,000 est. value
Wappingers Falls, NY 12590

Woodhull Waste Water Treatment Facility
Construction
Woodhull, NY 14898

Wastewater Treatment Plant Screen Upgrade
Construction
Catskill, NY 12414

Rogers Multifamily Residential
New Construction
Pending Verification
Westhampton Beach, NY 11978

WWTP Improvements
Renovation
Bidding
$1,450,000 est. value
Victor, NY 14564

Replace Wastewater Treatment Plant at Highland RC
Post-Bid
$3,325,000 to $4,650,000 est. value
Highland, NY 12528

Wastewater Treatment Facility at Amy Bull Crist Campus
Results
$1,000,000 to $1,200,000 est. value
Goshen, NY 10924

Wastewater Treatment Plant Phase I Upgrades
Construction
North Tonawanda, NY 14120

Last Updated 01/07/2022 02:52 PM
Project Title

Wastewater Treatment Systems

Physical Address View project details and contacts
City, State (County) Middle Island, Yaphank, NY 11953   (Suffolk County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract No. 1 - General Construction Installation of three (3) Innovative wastewater treatment systems. System #1 shall serve the existing Activity Building (P2545) & existing Shower Building (P2751) located at Cathedral Pines County Park. System #2 shall serve the existing Trap & Skeet Office (P2301) and System #3 shall serve the existing Comfort Station (P2306). System #2 and System #3 shall be located at Southaven County Park. Work for all three systems includes demolition of existing wastewater components, installation of new Innovative treatment systems, replacement and installation of leaching fields, installation of all power and control wiring for complete and operable treatment systems. Each system shall be supplied with a three year warrantee including all required O&M is included. In addition to the above-mentioned items, System #1 at Cathedral Pines County Park will also require the installation of a new grease trap for the kitchen waste, and separation of internal building sanitary piping to isolate sanitary waste from the kitchen waste.

Details

Sewage Treatment Plant, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents