Similar Projects
GVRMA Sitework Phase 3
Alteration
Conception
Rochester, NY 14623

Seneca Park Zoo Tropical Exhibit and Main Entry Service Road and Utility Relocation
New Construction, Infrastructure
Bidding
$44,450,000 CJ est. value
Rochester, NY 14621

Whitney Town Center Phase 2
New Construction, Infrastructure
Sub-Bidding
$7,000,000 CJ est. value
Fairport, NY 14450

Masonry and Concrete Services
Term Contract
Post-Bid
NY

RIT - Tait Preserve - Site Improvements
Alteration
Post-Bid
$2,060,000 est. value
Rochester, NY 14625

Group 31503 Bituminous Concrete Hot Mix Asphalt - (2021 VPP NYSDOT Specific Projects) (Federal and State Funds)
Term Contract
Results

Railroad Avenue Pump Station Improvements
Renovation
Results
Hilton, NY

Keuka Studios Addition
Addition, Demolition, Infrastructure
Pending Verification
$700,000 CJ est. value
Rush, NY 14543

Collamer Road Subdivision
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Hilton, NY 14468

Installation of Concrete Pads for Bus Shelters
Term Contract
Post-Bid
Albion, Batavia, Canandaigua, Lyons, Mount Morris, Rochester, Warsaw, Waterloo, NY 14609

Henrietta Fire District Station 6 - Sitework
Results
West Henrietta, NY 14586

Butternut Hill Subdivision
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Hilton, NY 14468

Removal of Tower at RTS Access
Demolition, Infrastructure
Post-Bid
Rochester, NY 14624

Precast Concrete Structures, Drainage Units and Risers
Term Contract
Results
NY

Nazareth College Shelter Site Development
Infrastructure
Post-Bid
Rochester, NY

Last Updated 08/02/2022 10:33 AM
Project Title

Town of Webster Redi Project Mo.65: Lake Road Pump Station Improvements - General Construction

Physical Address View project details and contacts
City, State (County) Webster, NY 14580   (Monroe County)
Category(s) Heavy and Highway, Sewer and Water, Single Trades
Sub-Category(s) Concrete, Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $498,500 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 28, 2022, this project has not yet been awarded. The project is expected to be awarded on July 29,2022. PROJECT NO. 1809.006 Total Estimated Project Cost $501,000.00 Grant Amount $475,950.00 The Project consists of improvements to the existing Lake Road Pump Station to raise its wet well, control building, pumps and controls, and new exterior generator 3-feet above base flood elevation. Bids shall be on a lump sum and unit price basis, with additive alternate bid items as indicated in the Bid Form. Each Bid must be submitted on the prescribed Bid Form and accompanied by Bid security, as prescribed in the Instructions to Bidders The Successful Bidder will be required to furnish the additional bond(s) prescribed in the Bidding Documents. In order to perform public work, the Successful Bidder and Subcontractors prior to contract award shall hold or obtain such license as required by State statutes, and Federal and local Laws and Regulations. Bids will not be accepted from Bidders that have been barred from competing on public works under General Municipal Law 5A-103-b. The Owner's right is reserved to reject all Bids or any Bid not conforming to the intent and purpose of the Bidding Documents.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents