Similar Projects
Gwin Elementary School HVAC Replacement Phase 2
Renovation
Sub-Bidding
$1,000,000 CJ est. value
Hoover, AL 35226

Home Weatherization Services
Post-Bid
AL

HVAC Water Treatment Services
Term Contract
Post-Bid
Birmingham, Center Point, AL 35203

Highlands HVAC Replacement
Results
$450,000 est. value
Birmingham, AL 35233

Birmingham City Schools HVAC Upgrades
Results
Birmingham, AL

Central Utilities Cooling Tower Refurbishment - Phase 3
Alteration
Post-Bid
$1,000,000 to $1,250,000 est. value
Birmingham, AL 35205

Crestline Elementary School 2021 Rooftop Unit Replacement
Results
$382,499 est. value
Mountain Brook, AL 35213

Community Health Services Building 20th Room 348 Replace Cooling Tower
Alteration
Post-Bid
$220,000 to $260,000 est. value
Birmingham, AL 35205

HVAC Upgrades for the Midfield City Schools
Alteration
Results
Midfield, AL 35221

UAB Zeigler HX Replacement
Alteration
Post-Bid
$75,000 to $95,000 est. value
Birmingham, AL 35233

National Boiler Inspection Services
Term Contract
Results

HVAC Services
Alteration
Post-Bid
Birmingham, AL

HVAC Upgrades Installation of Bipolar Ionization or Non-Thermal Plasma Technology for Midfield City Schools
Renovation
Results
Birmingham, AL

Spain Wallace Second Floor Molecular Lab Fan Coil Unit Replacement
Alteration
Post-Bid
Birmingham, AL

HVAC Upgrades Phase II
Alteration
Results
$1,300,000 est. value
Birmingham, AL

Last Updated 10/14/2022 02:05 PM
Project Title

Spain Wallace Second Floor Molecular Lab Fan Coil Unit Replacement

Physical Address View project details and contacts
City, State (County) Birmingham, AL 35233   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Request for Qualifications, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $850,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

SPAIN WALLACE SECOND FLOOR MOLECULAR LAB FAN COIL UNIT REPLACEMENT FOR THE University of Alabama Hospital Birmingham, Alabama UAB Project No. H225020 Architect's Project No. 029-21 A. SCOPE OF WORK: The scope of work entails the replacement of two above ceiling fan coil units and associated construction in the Spain Wallace 2nd Floor laboratory. The scope includes removal of existing and installation of new units, piping and insulation, and controls. The work shall be performed within the operating hospital facility using a high level of infection control measures. The Contractor shall demonstrate experience with the implementation and maintenance of infection control measures and interim life safety measures in hospital environments. The Contractor shall also demonstrate experience with performing construction in a hospital environment which had to remain operational during construction. B. PRIME CONTRACTOR BIDDER PRE-QUALIFICATIONS: Prime contractor bidders interested in submitting a proposal must apply for pre-qualification and must be licensed under the Provision of Title 34, Chapter 8, and Code of Alabama, 1975. Progress Design and Construction Documents: Prior to the pre-qualification deadline, project progress plans and specifications may be examined at the following location: Architect: Birchfield Penuel & Associates LLC 2805 Crescent Avenue, Suite 200 Birmingham, Alabama 35209 Mr. Clay Birchfield, AIA 205-870-1876 205-870-3058 fax clayb@bpa.net. A copy of current Alabama Contractors license is to be included in the pre-qualification submittal. Only prime contractor bidders who have completed the pre-qualification process and that have been approved will be eligible to submit a bid for the Project. The pre-qualification procedure is intended to identify responsible and competent prime contractor bidders relative to the requirements of this Project.Each prospective prime contractor bidder will be notified of the results of the pre-qualification, no later than September 8, 2022, by 5:00 PM Central Time. The Owner reserves the right to waive technical errors in applications, or abandon the pre-qualification process, should the interests of the Owner appear to be promoted thereby. Bonds: A certified check or bid bond payable to the University of Alabama at Birmingham in an amount not less than five percent (5%) of the amount of the bid, but in no event more than $10,000 must accompany the bidder's proposal. Performance and Statutory Labor and Material Payment Bonds will be required at the signing of the Contract. Bids: Bids must be submitted on proposal forms or copies thereof furnished by the Architect. No bid may be withdrawn after the scheduled closing time for receipt of bids for a period of ninety (90) days. The Owner reserves the right to reject bids if such action is determined to be in the best interest of the

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents