Similar Projects
RWCC Water Storage Tank Replacement
Term Contract
Design

Steelton Tank Rehabilitation
Alteration
Bidding
New Martinsville, WV

Hinkle Mountain, Little Laurel Waterline Extensions and Existing System Renovation
Renovation, Infrastructure
Bidding
Richwood, WV 26261

Sterling Water Treatment Tanks or Equivalent
Infrastructure
Post-Bid
Green Bank, WV 24944

Mod Branch Reservoir Rehabilitation
Infrastructure
Post-Bid
Welch, WV

World-Wide Water Storage Tank Remediation
Term Contract
Results

World-Wide Water Storage Tank Remediation
Term Contract
Results

Developing the Tank Site
Infrastructure
Bidding
Richwood, WV

Water Storage Tank
Infrastructure
Post-Bid
$200,000 est. value
WV

Replace Product Recovery Tank
Results
$250,000 to $500,000 est. value
Martinsburg, WV 25405

Liquid Asphalt Storage Tank
Infrastructure
Bidding
West Union, WV

LAST or LUST Corrective Action and Site Remediation
Infrastructure
Post-Bid
Charleston, WV

Cumberland Heights Water Storage Tank
Results
New Cumberland, WV

Contract 2 - Water Tank Rehabilitation
Results
Cowen, WV

Water System Improvements
Results
Less than $1,921,000 est. value
Augusta, WV 26704

Last Updated 04/06/2022 08:22 AM
Project Title

Ruffner Water Storage Tank - Contract 10B

Physical Address View project details and contacts
City, State (County) Lewisburg, WV   (Greenbrier County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Ruffner Water Storage Tank The Project consists of the construction of a 500,000-gallon potable water storage tank and foundation, valve vault, piping, site work, fencing, site stone surface, overflow, and drain. The storage tank materials of construction shall be factory-coated bolted steel, or high strength welded steel with a self-supporting roof, as determined by bidding. The project is identified as Contract No. 10B - City of Lewisburg Water System Improvements, Ruffner Water Storage Tank and is shown on Contract Documents prepared by Chapman Technical Group. Construction time limit is 365 calendar days for Contract No. 10B.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents