Similar Projects
Lander Sidewalk Improvement Project
Infrastructure
Bidding
$300,000 CJ est. value
Lander, WY 82520

Wyoming Department of Environmental Quality (WDEQ) Building, Sidewalk and Parking Lot Reconstruction Project
Infrastructure, Renovation
Bidding
$585,000 CJ est. value
Sheridan, WY 82801

Riverton High School Auditorium
New Construction, Infrastructure - 12,924 SF
Post-Bid
$8,200,000 CJ est. value
Riverton, WY 82501

Pre-Demolition Asbestos Abatement for Dewitt Student Center Building
Term Contract, Infrastructure
Post-Bid
$100,000 CJ est. value
Powell, WY 82435

Shoshoni Town Hall Renovation
Build-out, Renovation
Results
$835,500 CJ est. value
Shoshoni, WY 82649

EMA/CLCPH Archer Storage Facility
New Construction, Infrastructure - 19,507 SF
Results
$3,262,000 CJ est. value
Cheyenne, WY 82007

B5 Expand Room 211
Renovation
Post-Bid
$100,000 CJ est. value
Sheridan, WY 82801

Gillette City Pool Reconstruction
Infrastructure
Results
$5,461,595 CJ est. value
Gillette, WY 82716

Concrete Replacement Project Community Athletic Center
Infrastructure
Post-Bid
$400,000 CJ est. value
Casper, WY 82601

Transit Facility Parking Improvements
Infrastructure
Results
$182,453 CJ est. value
Casper, WY 82601

District 2 Bridge Rehabilitation
Infrastructure
Post-Bid
$4,000,000 CJ est. value
Kaycee, WY 82639

District 5 Bridge Rehabilitation
Infrastructure
Results
$2,721,678 CJ est. value
Ethete, WY 82510

Statewide Rumble Strips
Infrastructure
Post-Bid
$400,000 CJ est. value
Bosler, WY 82051

2023 Pavement Marking Project
Infrastructure
Results
$200,000 CJ est. value
Gillette, WY 82716

Big Piney Cutoff
Infrastructure
Post-Bid
$400,000 CJ est. value
Big Piney, WY 83113

Last Updated 03/16/2023 05:33 PM
Project Title

Campbell County School District Concrete Repairs

Physical Address View project details and contacts
City, State (County) Gillette, WY 82716   (Campbell County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Campbell County School District Concrete Repairs Wyoming preference will be given, according to the School Board Policy. The Campbell County School District reserves the right to accept or reject any or all bids and to waive any irregularities or informalities in biddings. The work in this contract is to remove and replace damaged concrete as requested throughout the District. Bid pricing will be based on the awarded Contractor supplying all labor, equipment, forms and tooling for the work to be completed at single site. "Large project" is defined as 2yds of concrete or more. "Small project" is defined as less than 2yds of concrete.Preparation: 1. Remove and dispose of existing concrete, sod, soil, and other debris. 2. Maintain existing water content of soil during removal and replacement process (Do not allow to dry out). 3. Prepare subgrade to match finished concrete slope. Hold slope of landings and walks to 2% lateral and away from buildings. Longitudinal slope along walks shall not exceed 5%. Slope along a flow line shall be 2% minimum unless design indicates otherwise. Slope perpendicular to a flow line shall be 2% minimum, 5% maximum Landings at steps shall slope 2% maximum each direction. 4. Where concrete is to be poured abutting existing concrete, #4 rebar dowels shall be installed, at 16" spacing into existing foundations, walls and slabs. Dowels shall be 12" long and shall be epoxy anchored 4" to 5" into existing concrete, locate dowels at center of concrete slab. 5. Set forms and brace substantially to lines and grades indicated. Place #3 reinforcing bars at 16" spacing each way, (6" maximum from edges) and provide rigid supports on a 36" grid pattern to hold bars at center of slab. Concrete: 1. Shall be a minimum 4000 PSI 28 day strength. 2. Provide minimum 6 sacks of Type 11 cement per cubic yard. 3. Slump of concrete shall not exceed 4". 4. Do not use fly ash or fiber mesh. 5. Hold lateral slope along walks to 2% away from building. Longitudinal slope of walks shall not exceed 5%. Slope along a flow line shall be 2% minimum unless design indicates otherwise. Slope perpendicular to a flow line shall be 2% minimum 5 % maximum. 6. Control joints shall be placed a maximum distance of 1 1/2 times walkway widths. 1/2" expansion joints shall be at approximately 30'maximum, shall have 1/2" smooth dowels (lubricated) through joint at 16", and shall be caulked with Dow 888. Control joints in slabs and walks shall be spaced no greater than 15'and shall be such that distance between joints does not exceed 1 1/2 times spacing of joints in the opposite direction. 7. Concrete shall be straight, smooth, and have a light broom finish to provide a uniform skid resistant surface without pulling aggregate loose, or creating deep or uneven scoring of the cement matrix. Care shall be exercised to maintain a linear slope adjacent to and away from face of building. Concrete shall not have a depression or back slope adjacent to face of building. 8. Concrete shall be protected until adequately cured to prevent damage by exposure, natural occurrences, or vandalism Any questions in regard to this bid should be directed to: Sean Mathes Supervisor of Buildings & Grounds 109 N. Gurley Ave. Gillette Wyoming 82716 Phone 307-682-2750 Question Cutoff Date: 2/20/2023 12:00 PM (ET)

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents