Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Hydrants Water Department
Term Contract
Sub-Bidding
Watertown, SD 57201

Hydrants Water Department
Term Contract
Sub-Bidding
Watertown, SD 57201

Pest Management Services
Term Contract
Post-Bid

Water Department Materials
Post-Bid
Watertown, SD

10th Avenue North Reconstruction
Results
$1,500,000 to $2,500,000 est. value
Watertown, SD 57201

Watermain Replacement
Infrastructure
Results
SD

Janitorial Services
Term Contract
Post-Bid
Rapid City, SD 57701

PVC Pipe - Water Department
Term Contract
Post-Bid
Watertown, SD

Underground Infrastructure Inspection
Infrastructure
Post-Bid

Fittings and Valves - Water Department
Alteration
Post-Bid
Watertown, SD

Hydrants- Water Department
Infrastructure
Post-Bid
Watertown, SD

Water Pipe - Water Department
Infrastructure
Post-Bid
Watertown, SD

Railroad Casing Pipe - Water Department
Infrastructure
Post-Bid
Watertown, SD

Water Meters - Water Department
Infrastructure
Post-Bid
Watertown, SD 57201

Last Updated 08/10/2022 12:32 AM
Project Title

Water Valves and Fittings Water Department

Physical Address View project details and contacts
City, State (County) Watertown, SD 57201   (Codington County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Service/Term Contracts, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Each bid shall be accompanied by bid deposit as a guaranty that such bidder will enter into a contract with said Municipal Utilities Board in case such bidder be awarded the contract. The bid deposit shall be in the form of a certified check, cashier's check or bank draft, for five percent (5%) of the amount of the bid OR a bid bond for ten percent (10%) of the amount of the bid. The check or bank draft should be made payable to Watertown Municipal Utilities. The bond should be issued by a surety authorized to do business in the State of South Dakota, such bond to be made payable to Watertown Municipal Utilities. CHECKS OR BONDS NOT COMPLYING WITH THESE PROVISIONS WILL DISQUALIFY BID. The right is reserved to reject any and all bids or any part of any bid. No bidder may withdraw their bid within thirty (30) days after the actual date of opening. The Watertown Municipal Utilities does not discriminate in employment opportunities or provision of services basis of race, color, religion, sex, national origin, age, disability, or any other characteristic protected by law.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents