Similar Projects
Water Main Replacement: Eldorado/Seville - W2 -18 - Village of Bellevue
Infrastructure
Conception
$650,000 CJ est. value
Bellevue, WI 54302

Josten North East Restrooms/Pavilion - LS19 - Village of Bellevue
New Construction, Infrastructure
Conception
$386,640 CJ est. value
Green Bay, WI 54311

Bayside Machine Corporation Expansion
Addition, Demolition, Infrastructure, Renovation - 27,680 SF
Design
$10,000,000 CJ est. value
De Pere, WI 54115

Coachway Condominiums
New Construction, Infrastructure - 6,160 SF
Design
$30,000,000 CJ est. value
Ashwaubenon, WI 54304

Foxview Intermediate School Exterior Wall Repair Project
Renovation, Infrastructure
Bidding
$347,500 CJ est. value
De Pere, WI 54115

W Mason St, City of Green Bay, Beaver Dam Creek Bridge
Infrastructure
Bidding
$250,000 CJ est. value
De Pere, WI 54115

Solid Waste Station And Recycling Transfer Station Hauling
Renovation
Post-Bid
WI

De Pere High School - Tennis Court Site Development
Infrastructure
Post-Bid
De Pere, WI 54115

Mystic Creek Subdivision
New Construction, Infrastructure
Results
De Pere, WI

WSG 3-22 Water Heater Replacement-Rebid
Demolition, New Construction, Infrastructure
Results
$50,000 CJ est. value
Green Bay, WI 54303

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Sewers 1-22 Basin Repairs
Infrastructure
Construction
$1,086,000 CJ est. value
Green Bay, WI 54301

Total Service Development Building Addition
Addition, New Construction, Infrastructure - 2,450 SF
Pending Verification
$525,000 CJ est. value
Howard, WI 54303

Project Cinco
Addition, New Construction, Infrastructure, Renovation
Pending Verification
$500,000,000 CJ est. value
Green Bay, WI 54304

Oak Park Drive Streambank Stabilization - ST26-01 - Village Of Bellevue
Infrastructure
Conception
$323,000 CJ est. value
Bellevue, WI 54311

Last Updated 02/20/2023 06:33 PM
Project Title

Sal St. & Industrial Dr. Sanitary Sewer Rehab - SS11 - Village of Bellevue

Physical Address View project details and contacts
City, State (County) Bellevue, WI 54302   (Brown County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $860,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is for replacing and lining sections of Sanitary Sewer on Sal Street and Industrial Drive. This area has a known high level of inflow from leaking pipes. Repairing sanitary lines will reduce volume in the system, saving costs to the Village and rate payers. Initial Estimates are: Lining 746 LF of 24" RCP Lining 3,273 LF of 8" NRCP Replacing 1,019 LF of 8" NRCP Repair or Replace 10 Sanitary Sewer Manholes Cost estimate provided by Cedar July, 2018 Cost estimate provided by Cedar September, 2019 Roadway paving will be coordinated to mill and resurface these roads in 2025, allowing trenches to settle. As of February 20, 2023, this project is included in the City of Washington City FY 2023-2027 CIP. Engineer information and a firm timeline for construction has not been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents