Similar Projects
Replace Fire Pump, Motor, Jockey Pump, Controllers & Transfer Switch
Alteration
Bidding
Miami, FL 33132

Edgewood Drainage Well Installation - NS069
Infrastructure
Bidding
Ocala, FL 34471

Unit 5 52 Circulating Water Pump Overhaul at Mcintosh Power Plant
Post-Bid
Lakeland, FL 33805

Wells and Pressure Tank Purchase and Installation Services
Post-Bid
Fort Pierce, FL 34945

Replace Chiller and Pumps at USCG Sector Key West, Florida
Results
$250,000 to $500,000 est. value
Big Coppitt Key, FL 33040

Repair Services for Pumps, Motors, and Other Equipment
Results
Kissimmee, FL 34741

VWCA Irrigation Pump Stations No. 1 and 2 Bypass Piping Installation
Infrastructure
Bidding
The Villages, FL 32162

Electric Motor Repair
Post-Bid
Cape Coral, FL 33915

Raw Water Well #9
Results
Hallandale, FL 33009

Water Treatment Plant Diesel Pumps and Motors Replacement Project
Infrastructure
Bidding
$600,000 est. value
Panama City, FL 32404

Annual Agreement For Wastewater Pump Station Repair And Renovation
Term Contract
Post-Bid
FL

New Condenser Water Return Well No.2
Term Contract
Results
Tallahassee, FL 32307

Well Drilling Services
Alteration
Bidding
Jacksonville, FL

SHIP Program Well and Septic Installation
Post-Bid
Macclenny, FL 32063

DX38 Dynamometer Pump and Motor Replacement Coast Guard Engineering
Results
$45,000 est. value
Miami Beach, FL 33139

Last Updated 02/09/2022 01:00 PM
Project Title

Fiesta Village Water Reclamation Facility Dual Zone Monitoring Well

Physical Address View project details and contacts
City, State (County) Fort Myers, FL 33919   (Lee County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To provide Dual Zone Monitoring Well (DZMW), drilling pad and shallow monitoring wells construction to support the Fiesta Village Water Reclamation Facility Dual Zone Monitoring Well project

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents