Similar Projects
GLDTC 552 Crestwood Drive, GLDTC 557 Dacusville Highway and GLDTC 559 Sterling Community
Post-Bid
$1,500,000 to $2,500,000 est. value
Greenville, SC

GLDTC 567 - Rothwell Drive/ Millport Circle Relocation
Post-Bid
$500,000 to $1,000,000 est. value
Mauldin, SC 29662

Fairforest Way Rehabilitation Project - Phase 2
Results
Greenville, SC

Resurfacing/Reclamation CMRB of 19.04 Miles of Roads
Results
$3,000,000 to $5,000,000 est. value
Greenville, SC

SCTAC Durability Track
Post-Bid
Greenville, SC

Resurfacing/Reclamation CMRB of 28.21 Miles of Various Roads
Results
$6,000,000 to $9,000,000 est. value
Greenville, SC

Durability Track
Post-Bid
Greenville, SC

Site Work, Grading and Paving for Kids Planet Playground
Results
Greer, SC 29651

Construct a Trail Head and a Section of the Swamp Rabbit Trail along a .25 Easement
Post-Bid
Mauldin, SC 29662

GLDTC 556-Fountain Inn High School Road Improvements
Results
$2,000,000 to $3,000,000 est. value
Fountain Inn, SC 29644

Rehabilitation
Results
SC

GLDTC 560.01 MMRP FY 19-20
Results
$1,500,000 to $2,000,000 est. value
Greenville, SC 29601

S-183 Widening
Results
SC

Woodruff Road Area Improvements Project
Results
Greenville, SC 29602

Preservation - Greenville County
Results
SC

Last Updated 09/11/2020 12:08 PM
Project Title

Reconstruction/Rehabilitation - Greenville Co

Physical Address View project details and contacts
City, State (County) SC   (Greenville County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds and Insurance 1.000 Ls Traffic Control 1.000 Ls Removal & Disposal of Existing Pavement 451.000 Sy Unclassified Excavation 1,320.000 Cy Borrow Excavation 1,400.000 Cy Excavation for Shoulder Paving 61.248 Sta Hauling of Excavated Shoulder Material 61.248 Sta Cement Modified Recycled Base (12" Unif)-curing Method B 78,310.000 Sy Cement Modified Recycled Base (14" Uniform) 15,840.000 Sy Portland Cement for Cement Modified Recycled Base Course 3,807.000 Ton Maintenance Stone 252.720 Ton Hma Shoulder Widening Course 408.320 Ton Liquid Asphalt Binder Pg64-22 1,076.149 Ton Full Depth Asph. Pav. Patching 8" Unif 5,272.000 Sy Milling Existing Asphalt Pavement 1.5" 19,384.000 Sy Milling Existing Asphalt Pavement 2.0" 18,795.000 Sy Milling Existing Asphalt Pavement 3.0" 15,840.000 Sy Milling Existing Asphalt Pavement (Variable) 962.000 Sy Milled-in Rumble Strip 3.880 Mi Hot Mix Asphalt Surface Course Type B 17,555.676 Ton Hot Mix Asphalt Surface Course Type C 610.000 Ton Driveway Paving-surface Type C 1,478.000 Ton Permanent Construction Signs (Ground Mounted) 2,668.000 Sf 4" White Broken Lines -(Gaps Excluded)-fast Dry Paint 15,100.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-fast Dry Paint 184,243.000 Lf 8"White Solid Lines(Crosswalk&channelization)fast Dry Paint 2,910.000 Lf 24" White Solid Lines (Stop/diagonal Lines)-fast Dry Paint 2,165.000 Lf White Single Arrow (Left, Straight, Right)-fast Dry Paint 48.000 Ea White Combination Arrow(Str.& Rt.or Str.& Lt.)fast Dry Paint 8.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 720.000 Lf 4"Yellow Solid Line(Pvt.edge&no Passing Zone)-fast Dry Paint 425,576.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Epoxy Paint 580.000 Lf 4"Yellow Solid Lines-pvt.edge&no Passing Zone - Epoxy Paint 580.000 Lf 4" White Broken Lines(Gaps Excl.)thermoplastic- 90 Mil. 2,930.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 71,952.000 Lf 8" White Solid Lines Thermoplastic - 125 Mil. 1,140.000 Lf 24" White Solid Lines (Stop/diag Lines)-thermo.-125 Mil 1,005.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 23.000 Ea White Word Message "Stop Ahead" -thermoplastic - 125 Mil. 2.000 Ea White Combination Arrows(Str&rt.or Str<)thermo-125mil 4.000 Ea 4" Yellow Broken Lines(Gaps Exc)thermoplastic - 90 Mil. 180.000 Lf 4" Yellow Solid Lines(Pvt.edge Lines) Thermo-90 Mil. 84,680.000 Lf Permanent Clear Pavement Markers- Mono-dir.- 4"X4" 146.000 Ea Permanent Yellow Pavement Markers Bi-dir.- 4"X4" 901.000 Ea Furnish & Install 1.0" Schedule 80 Pvc Conduit 840.000 Lf Furnish & Instl No. 14 Copper Wire,1-conductor for Loop Wire 15,080.000 Lf Sawcut for Loop Detector 5,480.000 Lf F&i-13"X24"X18"D.elec.flush Undgrd.enclos-(Str.poly.conc.)hd 12.000 Ea Furnish & Install Video Detection Camera W/ Hardware & Lead-in 10.000 Ea Detectable Warning Material 237.500 Sf Pedestrian Ramp Construction 475.000 Sy Remove & Dispose Semi-rigid Gr Device 300.000 Lf Premash Reset W-beam Strong Post System 2,110.000 Lf Premash Type T Tl3 Leading 50` 12.000 Ea Permanent Grassing for Non-permitted Resurfacing Projects 6.788 Acre

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents