Similar Projects
Mccormick House HVAC System Replacement
Post-Bid
Harrisburg, PA 17110

Chiller Replacement – 22nd and Forster Streets Facility
Post-Bid
$400,000 to $600,000 est. value
Harrisburg, PA 17103

Primary Center Gymnasium HVAC Upgrades
Results
Less than $124,800 est. value
Hershey, PA

Granada Building Chiller Replacement
Results
Hershey, PA

Capitol Complex – Automation System Upgrades
Post-Bid
Less than $3,200,000 est. value
PA

Hershey Middle School Boiler Heat Exchanger Replacement
Results
Hershey, PA 17033

Hershey Elementary School Chiller Replacement
Post-Bid
Hershey, PA 17033

Farm Show Complex - Upgrade Facilities (HVAC Construction)
Results
$3,000,000 to $5,000,000 est. value
Harrisburg, PA 17110

HVAC and Mechanical Products
Term Contract
Post-Bid

Friendship Community Center HVAC Roof Top Unit Upgrades- Phase 2
Results
$320,000 to $380,000 est. value
Harrisburg, PA 17112

Capitol Complex Central Plant Steam Tunnel Repairs - HVAC Construction
Post-Bid
$400,000 to $500,000 est. value
Harrisburg, PA 17100

Middletown Train Station HVAC Contracting
Results
$200,000 to $499,999 est. value
Middletown, PA 17057

Forum Building - Construction and Related Improvements - HVAC Construction
Results
Less than $10,000,000 est. value
Harrisburg, PA 17120

Royalton Borough Building HVAC Upgrades
Results
$25,000 est. value
Royalton, PA 17057

CAT Operations Facility – Interior Renovations Project (HVAC)
Results
Harrisburg, PA 17104

Last Updated 12/12/2019 12:18 PM
Project Title

Construction of a 3,280 SF Pole Building - HVAC Construction

Physical Address View project details and contacts
City, State (County) Harrisburg, PA 17109   (Dauphin County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the construction of a 3,280 sf pole building to be utilized by Lower Paxton Township Authority as an accessory storage facility. The pre-fabricated building will be purchased by the awarded contractor (Contract No. 2019-1 (B)) and assembled on site. Minimal site preparation and earthwork activities will be required on the existing site. Work associated with the development includes the construction of a concrete slab and apron, trench drain, electrical and water service feeds to be provided from the existing Authority building. Internally the building will be insulated and heated with gas fed unit heaters. All disturbed areas surrounding the new structure will be repaved and restored to the existing conditions. Parking spaces will be restriped at the new designated locations. There are minor storm water system modifications and downspout laterals to be installed to direct storm water/roof run off to an outfall to the existing storm water management facility.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents