Similar Projects
Northwestern College Residence Hall
New Construction, Infrastructure
Sub-Bidding
$11,000,000 CJ est. value
Orange City, IA 51041

Kwik Trip / Sioux Center
New Construction, Infrastructure
Post-Bid
$300,000 CJ est. value
Sioux Center, IA 51250

Kitchen Renovation Sioux Center Christian School
Addition, Demolition, Renovation, Infrastructure - 4,869 SF
Post-Bid
$600,000 CJ est. value
Sioux Center, IA 51250

PCC Patching
Infrastructure
Results

2022 Street Rehabilitation
Infrastructure
Results
$300,000 est. value
Hull, IA

2022 City of Sioux Center Commercial Development Project
Infrastructure
Construction
$783,190 CJ est. value
Sioux Center, IA 51250

2022 City of Sioux Center Commercial Development Project
Infrastructure
Construction
$783,190 CJ est. value
Sioux Center, IA 51250

2022 Bond - Rock Valley School District
New Construction, Build-out, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Rock Valley, IA 51247

RFP Construction Manager - Dordt University - Dining Commons / Recital Hall Addition
Addition, Demolition, Infrastructure
Post-Bid
$3,000,000 CJ est. value
Sioux Center, IA 51250

High School Addition & Renovation
Addition, Demolition, Renovation, Infrastructure - 192,000 SF
Results
$3,944,183 CJ est. value
Orange City, IA 51041

North Weiland Third Addition Subdivision Improvements
Infrastructure
Post-Bid
$200,000 CJ est. value
Orange City, IA 51041

Granular Surfacing of Roadway
Infrastructure
Results

Furnishing PVC Pipe for the Southwest Well Field Raw Water Main
Infrastructure
Results
Orange City, IA

Ramp Parking Lot Improvements
Infrastructure
Results
$260,000 est. value
IA 51201

Sioux Center - 2nd Avenue South East Water Main Replacement
Infrastructure
Results
$206,615 CJ est. value
Sioux Center, IA 51250

Last Updated 03/19/2023 08:04 AM
Project Title

2nd Avenue Utility and Paving Improvements

Physical Address View project details and contacts
City, State (County) Hospers, IA 51238   (Sioux County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,388,714 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Proposals will be reported to the City Council for consideration at the meeting scheduled for 20th day of March, 2023 at 5:30 o'clock P.M. in the Council Chambers in said City. The extent of the WORK involved consists generally of: Replacement of Sanitary Sewer Main, Water Main, Storm Sewer, Street Pavement, and related items of work. The WORK shall be constructed at or adjacent to the existing wastewater treatment facility. The City will receive and consider bids on the entire project and will enter into a single contract for the proposed construction. All work is to be done in strict compliance with the Contract Documents, which have heretofore been approved by the City Council, and are now on file for public examination in the office of the City Clerk. All BIDS must be filed in said office on or before the time herein set, on forms furnished by the Owner, and must be enclosed in a separate sealed envelope and plainly identified. Each BID shall be accompanied by a BID BOND, certified check, cashier's check, or certified credit union share draft in a separate sealed envelope in an amount equal to ten per cent (10%) of the total amount of the BID. If BID BOND is submitted, it must be on the form provided with the CONTRACT DOCUMENTS. The certified check, cashier's check, or certified credit union share draft shall be drawn on a bank in Iowa, a bank chartered under the laws of the United States of America, or said certified share draft shall be drawn on a credit union in Iowa or chartered under the laws of the United States and payable to the Treasurer of the OWNER as security that if awarded a contract, the BIDDER will enter into a contract at the prices BID and furnish the required PERFORMANCE and PAYMENT BONDS and Certificate of Insurance. The certified check, cashier's check, or certified share draft may be cashed, or the BID BOND forfeited, and the proceeds retained as P:\03\071\313\371313\Specs\Master\00C-Notice of Hearing & Letting - Public Project.docx NHL-2 liquidated damages if the BIDDER fails to execute a contract or file acceptable PERFORMANCE and PAYMENT BONDS or provide an acceptable Certificate of Insurance within ten (10) days after the acceptance of said BID by resolution of the City Council. No BIDDER may withdraw a BID within thirty-five (35) days after the date set for opening BIDS.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents