Similar Projects
Downtown Stormwater Treatment Phase 4 - STRH02 - City of Bozeman
Renovation
Conception
$250,000 CJ est. value
Bozeman, MT 59715

Downtown Stormwater Treatment Phase 3 - STRH01 - City of Bozeman
Renovation
Conception
$300,000 CJ est. value
Bozeman, MT 59715

West End Water Treatment Plant
New Construction, Infrastructure
Sub-Bidding
$200,000 CJ est. value
Billings, MT 59106

Town of Wibaux Wastewater Treatment System Upgrades Project
New Construction, Infrastructure
Post-Bid
$3,000,000 CJ est. value
Wibaux, MT 59353

Simms Wastewater Treatment System Improvements - Phase II
Infrastructure, Renovation
Post-Bid
$330,000 CJ est. value
Simms, MT 59477

Buena Vista Community Phase 2 Wastewater System Improvements
Renovation
Results
$580,000 est. value
Missoula, MT

Town of Terry Wastewater Treatment System Upgrades
Renovation
Results
$4,523,906 CJ est. value
Terry, MT 59349

Mechanical Separation Units - Downtown Stormwater Treatment Phase 2 - STRM39 - City of Bozeman
Renovation
Conception
$300,000 CJ est. value
Bozeman, MT 59715

Philipsburg Wastewater Treatment System Improvements Equipment
Renovation, Infrastructure
Post-Bid
$965,000 CJ est. value
Philipsburg, MT 59858

Wilsall Water District Water System Improvements
New Construction, Renovation, Infrastructure
Results
$4,280,000 CJ est. value
Wilsall, MT 59086

Resurface and Repaint Clarifiers - WW39 - City of Bozeman
Renovation
Conception
$320,000 CJ est. value
Bozeman, MT 59718

RFQ Design - Kalispell Wastewater Treatment Plant Equalization Basin Project
Renovation
Post-Bid
$300,000 CJ est. value
Kalispell, MT 59901

Water System Improvements Tanks and Backup Power Project
Renovation, Infrastructure
Results
$7,612,746 CJ est. value
Shelby, MT 59474

Bioreactor Basin Blowers - City of Helena
Renovation
Conception
$250,000 CJ est. value
Helena, MT 59602

RFQ Design - Engineer Consultants for Kalispell WWTP (Wastewater Treatment Plant) Fermenter Rehabilitation Project
Renovation
Post-Bid
$145,000 CJ est. value
Kalispell, MT 59901

Last Updated 10/10/2023 02:34 AM
Project Title

RFQ Construction Manager - West End Water Treatment Plant

Physical Address View project details and contacts
City, State (County) Billings, MT 59103   (Yellowstone County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Construction Management - CM at Risk, Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected December 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $65,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of a West End Water Treatment Plant (WEWTP) capable of treating Yellowstone River water either directly from a Billings Bench Water Association (BBWA) diversion facility or from future reservoirs to meet all primary drinking water standards. The WEWTP will deliver up to 18 MGD and be expandable to 36 MGD. Process design includes rapid mix chemical pre-treatment, flocculation, sedimentation and membrane filtration. Filtered water will be delivered to the City's distribution system by pumping from a below-grade clearwell through high service pumps. WEWTP building design, yard piping connections and residual solids handling facilities are also included in the project. During the preconstruction phase, the Contractor will work as an integral part of the project team to evaluate and further develop the project design, assisting the Engineer and City in identifying opportunities for improvement, value engineering, and offering alternative solutions. The various project design components currently range between 60% to 90% complete. The Contractor will develop cost estimates and offer suggestions with respect to means, methods, materials innovations and construction sequencing. During the construction phase, the Contractor will provide the necessary resources and subcontractors to construct the project. Throughout the entire process, the objective is to maintain a spirit of cooperation and open communication so that project goals and objectives are clearly understood, potential problems are promptly resolved, and upon completion, the project is deemed a success by all. Questions regarding this Request for Qualifications and Proposals (RFQ&P) shall be submitted to: City of Billings Attention: Randy Straus, PE City Engineer's Office 2224 Montana Ave Billings, MT 59101 (406) 657-8301 strausr@billingsmt.gov from 7:30 a.m. to 4:30 p.m., local time, Monday through Friday

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents