Similar Projects
Airport Airfield, Terminals, Ground Access Infrastructure
Renovation, Alteration
Conception
San Antonio, TX

Carnahan Canal Renovations at Witte Museum
Renovation
Design
San Antonio, TX 78209

Repair Schofiled Road -JBSA Fort Sam Houston, TX
Term Contract
Design
San Antonio, TX 78275

Pavement Repairs for Berman and Citrus Roads Project
Infrastructure
Bidding
San Antonio, TX 78226

South Alamo Street (Market Street to Cesar Chavez Boulevard)
Infrastructure
Bidding
$15,400,000 est. value

Construction of Johnson Ranch North Unit 9 Public Water, Wastewater, Paving and Drainage Improvements and Johnson Ranch North Unit 9 Private Paving and Grading Improvements
Post-Bid
San Antonio, TX

HEB - Turn Lane Improvements
Post-Bid
San Antonio, TX

Southern Region Disaster Recovery Support BPA
Results

North Street Mary's Street (East Mistletoe Avenue - West Josephine Street)
Results
$7,897,680 est. value
San Antonio, TX 78200

IH 35 - Safety Improvement Projects
Infrastructure
Bidding
$2,543,232 est. value
TX

Olmos Park FY 2020-2021 Street and Drainage Maintenance
Post-Bid
Olmos Park, TX

FY21 Pavement Preservation Package 1 - Crack Seal Task Order Contract
Results
Less than $495,000 est. value
San Antonio, TX 78283

South Presa Street (SE Military to W. Boyer)
Infrastructure
Bidding
$13,808,700 est. value
San Antonio, TX 78275

SW Clinic Re-Pavement Project
Renovation
Post-Bid
San Antonio, TX 78237

Brooks City Base Stinson Corridor (Research Plaza to South Presa Street)
Results
$6,086,452 est. value
San Antonio, TX 78205

Last Updated 03/31/2022 08:22 AM
Project Title

Hemisfair Park Streets Phase 2

Physical Address View project details and contacts
City, State (County) TX   (Bexar County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,244,470
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Reconstruct Hemisfair Boulevard from E. Nueva to Tower of Americas Plaza including the construction of roadway improvements, sidewalks, illumination, landscaping, irrigation, sotrm sewer upgrades. Also included as part of this project will be joint bid CPS Energy utility work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents