Similar Projects
Crenshaw Street Lift Station and Force Main Upgrades
New Construction, Infrastructure
Bidding
Mobile, AL 36606

Newfound Creek No. 1 and No. 2 Pump Station Improvements
Renovation
Bidding
$3,600,000 est. value
Birmingham, AL

New Pumping Station (Contract C)
Post-Bid
Irvington, AL 36544

Rehabilitation of Pumping Station No. 2
Post-Bid
Less than $110,000 est. value
Samson, AL

South Parkway Raw Water Pump Station Improvements
Results
Less than $2,294,106 est. value
Huntsville, AL 35804

Jones Road Pump Station Upgrade and Gravity Sewer
Results
Athens, AL 35613

Fort Morgan Road Sewer Improvements - Marina Lift Station and Peninsula Lift Station
Renovation
Construction
Gulf Shores, AL 36547

Water Infrastructure Improvements Project (Water Booster Pump Station) - Contract 1
New Construction
Bidding
Vina, AL

USDA Crown Castle 500,000 Gal EWT and CR 266 300,000 Gal EWT and USDA Water System Improvements
Post-Bid
Less than $2,200,000 est. value
Valley, AL 36854

Cherry Tree Booster Pump Station
Results
Less than $370,751 est. value
Huntsville, AL 35801

Lift Station 10 Upgrade: Equalization Tank
Renovation
Bidding
Tuscaloosa, AL

Wastewater Treatment Plant Upgrades
Post-Bid
Less than $1,500,000 est. value
West Blocton, Woodstock, AL

Gin Shop Lift Station Improvements
Results
Prattville, AL

Lift Stations 10 and 11 Upgrades Project
New Construction
Bidding
$3,000,000 est. value
Tuscaloosa, AL

Lagoon Park Golf - New Pump Station
Post-Bid
$130,000 to $145,000 est. value
Montgomery, AL 36109

Reported 12/10/2021 12:00 AM
Project Title

Pump Station 9 Force Main Relocation

Physical Address View project details and contacts
City, State (County) Montgomery, AL   (Montgomery County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the following major components: 1.Installation of CSX Crossing Number 1, 24-inch diameter steel casing by jack and bore, 191 LF. 2.Installation of CSX Crossing Number 2, 24-inch diameter steel casing by jack and bore, 97 LF. 3.Abandonment of existing CSX 12-inch force main crossing by grouting, two (2) existing crossings. 4.2,305 LF of unclassified trench excavation and backfill, 0-10 feet in depth. 5.721 feet of 12-inch PVC AWWA C900 DR-18 Restrained joint sewer force main. 6.1,853 LF of 12-inch PVC AWWA C900 DR-18 Unrestrained sewer force main. 7.Installation of five (5) combination air release valve assemblies and manholes. 8.Installation of one (1) 12" inside drop in discharge manhole. 9.Installation of 6,500 pounds of epoxy lined ductile iron restrained joint fittings. 10.Installation of three (3) 12-inch eccentric plug valves. 11.Approximately 8,200 linear feet of saw cutting pavement. 12. Approximately 2,940 SY of asphalt pavement restoration. 13. Adjustment of approximately 5 sewer laterals. 14. 10 linear feet of 24-inch steel casing by open-cut. 15. Cut/Plug of existing 12" sewer force main. 16. Relocation of 6" potable water line with two (2) 6-inch by 6-inch tapping sleeve and valves and two (2) concrete deadmen and cut/plugs.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents