Similar Projects
Recoat Discharge Tubes at Mark Wilmer Pumping Plant
Renovation
Bidding
Phoenix, AZ

Vistancia Pump Station Conversion - Zone 5/6 To Zone 6/7
Post-Bid
Scottsdale, AZ 85383

Warner Road Wastewater Lift Station Modifications JOC
Results
Mesa, AZ

Oracle R12.2 Upgrade Project
Results
Phoenix, AZ

Vistancia Boulevard - Sewer Lift Station I-1
Construction
Peoria, AZ 85383

Adonis Lift Station and Force Main
Results
Less than $1,000,000 est. value
Marana, AZ

DRR Effluent Wash Water Project
Results
Less than $200,000 est. value
Sierra Vista, AZ

Lift Station No. 1 Phase 4 Contract 107
Results
$250,000 to $300,000 est. value
Parker, AZ 85344

Design Build Services for Continental Ranch Regional Pump Station Force Main Augmentation
Results
$27,500,000 to $29,000,000 est. value
Tucson, AZ 85701

ASU West Campus Irrigation Pump Station Upgrade
Results
$600,000 to $600,000 est. value
Phoenix, AZ 85306

Mcallister Pump House and Pipeline
Results
$1,000,000 to $1,500,000 est. value
Flagstaff, Kachina Village, AZ 86001

Design-Build Services For Waddell Pumping Plant Plc-5 Replacement Project
Results
Less than $3,150,000 est. value
Phoenix, AZ

Luke Air Force Base Lift Station Construction Manager at Risk Services
Results
$3,000,000 est. value
Glendale, AZ 85301

Tusayan Pumphouse Improvements – Replacement of Pumps, Plumbing and Pump Controls
Results
$25,000 to $75,000 est. value
Grand Canyon, AZ

Booster Pump Station 57 Rehabilitation
Results
$5,621,000 to $6,500,000 est. value
Scottsdale, AZ 85258

Reported 11/05/2020 12:00 AM
Project Title

Chaparral Pines Lift Station No. 3 Replacement

Physical Address View project details and contacts
City, State (County) Gisela, AZ 85541   (Gila County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of replacing two existing rectangular wetwell vaults with a new prea cast polymer concrete triplex wetwell and a prea fabricated metal building to house all above grade mechanical piping. The existing vaults will be converted to storage vaults.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents