Similar Projects
Pavement Preservation and Rehabilitation North - 2021
Infrastructure
Bidding
$500,000 est. value
Arlington Heights, Mount Prospect, Palatine, Schaumburg, Streamwood, IL 60056

2022 Street Patching
Infrastructure
Bidding
$300,000 est. value
La Grange, IL

Street Resurfacing Program
Renovation
Post-Bid
Mount Prospect, IL

Hilltop Elementary School Tennis Courts & Asphalt Paving
Post-Bid
Elgin, IL 60120

Green Alley Reconstruction
Results
Less than $475,000 est. value
Harwood Heights, IL

Terminal Area Fire Main Relocation - Lower Level Utility and Pavement Reconstruction
Results
Chicago, IL

Intermodal Container & Truck Chassis Storage Yard Expansion
New Construction, Addition, Alteration - 1,000 SF
Construction
Less than $500,000 CJ est. value
Chicago, IL 60652

Public Works Annex Access Roadway and Storage Yard Paving
Infrastructure
Bidding
$377,547 est. value
Lemont, IL 60439

Niles West High School 2021 Paving and Sealcoating
Post-Bid
Skokie, IL 60077

Street Improvement
Results
Less than $464,820 est. value
Morton Grove, IL

City Hall Parking Lot Green Infrastructure Paving Improvements
Infrastructure
Bidding
$150,000 est. value
Burbank, IL

2021 Pietrini School Traffic Flow Alteration
Post-Bid
Franklin Park, IL 60131

(4.8-Mile) of SMART Overlay, Milled Rumble Strips and ADA Improvements on Palatine Road From IL 62 (Algonquin Road) to East of Roselle Road
Results
Barrington Hills, Hoffman Estates, Inverness, Palatine, South Barrington, IL

2022 Street Program
Infrastructure
Bidding
$990,000 est. value
Chicago Ridge, IL

2021 Street Maintenance Program
Post-Bid
Streamwood, IL

Reported 06/28/2022 02:22 PM
Project Title

Mcconnor Parkway From Roosevelt Boulevard To Golf Road - Village Of Schaumburg

Physical Address View project details and contacts
City, State (County) Schaumburg, IL 60173   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected February 2026
Bids Due View project details and contacts
Estimated Value $6,550,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of pavement reconstruction of McConnor Parkway from Roosevelt Blvd to Golf Road. McConnor Parkway is a commercial roadway. The entire roadway segment is 1.1 miles long and this section is 0.6 miles long and four lanes wide but preliminary engineering will determine if a road diet is a possibility. This segment will also include an intersection analysis to determine if a left turn can be added from EB Golf to NB McConnor. As of June 27, 2022, this project is in the conceptual phase and a study is in progress. This project is currently in the FY 2022-2027 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2025. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents