Similar Projects
Tyndall AFB Civil Works IDIQ Sources Sought
Design
Panama City, FL 32403

Homestead ARB BAK 12
Bidding
$1,000,000 to $5,000,000 est. value
Homestead, FL 33033

AASF 2 Brooksville Armory - Flightline/Taxiway Aprons and Gate Replacement
Bidding
$400,000 to $500,000 est. value
Brooksville, FL 34604

Quincy Municipal Airport Box Hangar and Taxiway Project
Post-Bid
Quincy, FL 32352

Ground Run-Up Enclosure
Post-Bid
Less than $4,000,000 est. value
Melbourne, FL 32901

General Aviation Center Civil Package
Results
Punta Gorda, FL 33982

Rehabilitate Northeast Quadrant Taxiways A, B and C at Lakeland Linder International Airport
Results
Lakeland, FL 33801

Taxiway A (Phase 2 West Section) Pavement and Lighting Rehabilitation
Bidding
$1,000,000 to $1,400,000 est. value
Palatka, FL 32177

Taxiway B Rehabilitation Winter Haven Airport
Post-Bid
$358,000 est. value
Winter Haven, FL 33881

Repair Cracks, Joints, Slabs, Airfield
Results
$1,000,000 to $5,000,000 est. value
Patrick AFB, FL 32925

Crystal River Airport Runway 9-27 Pavement Rehabilitation Project
Bidding
$1,973,000 est. value
Crystal River, FL 34429

Rehabilitation of Runway 14-32
Post-Bid
Quincy, FL

Construction Management at Risk Services for the Cecil Airport Eastside Development Site
New Construction - 370,000 SF
Results
Jacksonville, FL 32221

Taxiway `E` Extension
Bidding
Venice, FL

Runway 6-24 and Taxiway B and D Lighting Rehabilitation at Apalachicola Regional Airport
Post-Bid
Apalachicola, FL 32320

Last Updated 12/12/2019 09:23 AM
Project Title

Airport Segmented Circle at Treasure Coast International Airport and Business Park

Physical Address View project details and contacts
City, State (County) Fort Pierce, FL 34946   (Saint Lucie County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Airport Segmented Circle being proposed will replace the existing segmented circle, updating its configuration to a 100 feet diameter, per the new Federal Aviation Administration Advisory Circular (FAA AC) 150/5340-5D Segmented Circle Airport Marker System. The project’s major construction activities include but are limited to: mobilization, maintenance of traffic, existing concrete/segmented circle removal; new concrete//segmented circle construction; earthwork compaction/sodding; and airport wind cone removal and installation.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents