Similar Projects
Golden Gate City Transmission Water Main Improvements - Phase 2
Infrastructure
Bidding
$6,115,490 est. value
FL

Construction of SR 312 Reclaim Water Line
Infrastructure
Bidding
$2,000,000 est. value
Saint Augustine, FL

Aerial (Pipe) Crossing, Maintenance Services
Term Contract
Post-Bid
Palm Beach, FL

Rice Road Potable Water Main Extension
Post-Bid
Plant City, FL 33566

CDBG University Square Water Replacement
Results
Temple Terrace, FL 33617

Poinciana Service Area Utility Construction Neighborhood 2 West, Village 7
Results
$3,100,000 est. value
Kissimmee, FL 34741

Palm Tree Water Main and Force Main Improvements
Infrastructure
Bidding
$200,000 est. value
Cape Coral, FL

Installation of 96 inch Butterfly Valve on Hialeah WTP Raw Water Main
Post-Bid
$1,341,166 est. value
Miami, FL 33134

Fire Hydrant Repairs
Results
Less than $138,125 est. value
Mexico Beach, FL 32410

Rehabilitate Water Distribution System at Long Pine Key Campground
Infrastructure
Bidding
$500,000 to $1,000,000 est. value
Homestead, FL

Gate Valves
Post-Bid
Palm Bay, FL

Curley Street Water Main Relocation
Results
$291,633 est. value
San Antonio, FL 33576

New Force Main and Low-Pressure System
Infrastructure
Bidding
$400,000 est. value
Crawfordville, FL

SLID Pinedale Water Main Improvements
Post-Bid
$350,000 to $450,000 est. value
Sebring, FL

Palatlakaha River Villa City Water Control Structures Replacement
Results
Tavares, FL

Reported 06/24/2022 12:00 AM
Project Title

Backflow Survey, Inspection, Maintenance and Installation Services

Physical Address View project details and contacts
City, State (County) Kissimmee, FL   (Osceola County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Cross-Connection Control and Backflow Prevention Program. The awarded Contractor(s) shall perform survey, inspection, maintenance, new installations, install replacements and field test backflow assemblies where applicable.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents