Similar Projects
Fuel Systems Maintenance Services
Infrastructure
Results
Saint Louis, MO

Aboveground Fuel Tank Inspection and Fuel Oil Filtering
Term Contract
Post-Bid
Kansas City, MO 64128

Aboveground Fuel Tank Inspection and Fuel Oil Filtering
Term Contract
Post-Bid
Kansas City, MO 64128

Aboveground Fuel Tank Inspection and Fuel Oil
Term Contract
Post-Bid
Kansas City, MO 64128

Public Works Facility Fuel Island Replacement
Infrastructure
Results
Chesterfield, MO 63005

Sikeston Memorial Municipal Airport - Fuel System Improvements
Infrastructure
Post-Bid
Sikeston, MO 63801

Highway Department Maintenance Facility - Phase 2
Post-Bid
Carthage, MO

Automated Fuel System with Def Dispenser
Results
Joplin, MO

Self Service Fuel Island
Infrastructure
Results
Lebanon, MO 65536

FY22 KC District Fuel Tank Replacement
Infrastructure
Results
Platte City, MO

FY22 KC District Fuel Tank Replacement
Infrastructure
Results
Platte City, MO

FY22 KC District Fuel Tank Replacement
Infrastructure
Results
Platte City, MO

FY22 KC District Fuel Tank Replacement
Infrastructure
Results
Platte City, MO

Fuel Station Maintenance and Repair Services
Infrastructure
Results
Columbia, MO

Last Updated 03/29/2022 02:51 PM
Project Title

Fuel Dispenser Expansion

Physical Address View project details and contacts
City, State (County) Columbia, MO 65202   (Boone County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Procure materials and Construct a fueling station at columbia solid waste and collection facility. Construction consists of concrete pavement, footing, storm water piping and Structures and all neccessary appurtenances and incidentals. City utilities is also asking for alternate pricing for the manufactures canopy and installation

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents