Similar Projects
Grade, Drain, Surface, and Structures - SH-30
Infrastructure
Bidding
OK

Drainage Channel Clearing Project B
Infrastructure
Bidding
Elgin, OK

Dirt
Post-Bid
Marlow, OK

Drainage Improvements to Super Span I-44 and Classen Boulevard
Infrastructure
Post-Bid
$1,452,805 est. value
Oklahoma City, OK

Bank Protection
Results
Cherokee, OK

Grade, Drain, Surface, and Bridge SH-31: From 1.7 Miles East of the US-270 Junction, Extend Norteast near Krebs
Results
Krebs, OK

Drainage Channel Clearing Project A
Infrastructure
Bidding
Elgin, OK

Kendalwood Park North Drainage Improvement Project
Infrastructure
Post-Bid
Glenpool, OK

500 Block East Broadway Avenue Box Culvert Replacement
Results
OK

Sand Springs Franklin Creek Channel Improvement at Case Park Soccer Complex
Infrastructure
Post-Bid
Sand Springs, OK

2200 Block North Cleveland Street Drainage Channel Improvement
Results
Enid, OK 73703

Repair Cass System Drain
Term Contract
Post-Bid
$100,000 to $250,000 est. value
Enid, OK 73703

Grade, Drain, Surface, and Bridge
New Construction, Infrastructure
Results
Okemah, OK 74859

Build New Terraces
Alteration
Post-Bid
OK

Merkle Creek Drainage Improvements
Infrastructure
Results
Norman, OK 73072

Reported 01/12/2022 12:00 AM
Project Title

Indian Springs Culvert Improvements

Physical Address View project details and contacts
City, State (County) Broken Arrow, OK 74011   (Tulsa County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

SW1911 Indian Springs Culvert Improvements is a culvert replacement project on an arterial street (Jasper St.) in Broken Arrow, OK. The project is comprised of culvert replacement, full street reconstruction, utility replacement / relocation, turf reinforcement matting installation, and other erosion mitigation measures. The project will require the road to be closed during construction. The road closure shall be scheduled to take place in the summer 2022, after schools are not in session. Utility relocation and any other work that can be done, without closing the road, may be done before that time. The contract time will reflect the extended timeline of the project. The project can be constructed using either cast-in-place culvert or pre-cast culvert options.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents