Similar Projects
Last Updated | 10/17/2023 07:03 AM |
Project Title | Replace Boilers and Controls Farmington Correction Center |
Physical Address | View project details and contacts |
City, State (County) | Farmington, MO 63640 (Saint Francois County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | $4,194,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Scope: The project includes replacing burners and boiler controls on three 41,000 MBH steam boilers, demolishing (2) Existing Steam Boilers, installing a new steam to domestic hot water plant to support the south loop, installing a new steam to heating water plant to support the south loop, installing a new domestic water booster skid to support the plant and campus, installing new pre- insulated fiberglass piping from central plant to south loop, and all infrastructure to support scope listed above. MBE/WBE/SDVE Goals: MBE 10%, WBE 10%, and SDVE 3%. NOTE: Only MBE/WBE firms certified by the State of Missouri Office of Equal Opportunity as of the date of bid opening, or SDVE(s) meeting the requirements of Section 34.074, RSMo and 1 CSR 30-5.010, can be used to satisfy the MBE/WBE/SDVE participation goals for this project. The State reserves the right to reject any and all bids and to waive all informalities in bids. No bid may be withdrawn for a period of 20 working days subsequent to the specified bid opening time. The contractor shall pay not less than the prevailing hourly rate of wages for work of a similar character in the locality in which the work is performed, as determined by the Missouri Department of Labor and Industrial Relations and as set out in the detailed plans and specifications. Information for upcoming bids, including downloadable plans, specifications, Invitation for Bid, bid tabulation, award, addenda, and access to the ADS planholders list, is available on the Division of Facilities Management, Design and Construction's web site: electronically. Question Deadline 08/21/2023 at 12:00 PM CT |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |