Similar Projects
Van Nuys and Voss Mixed Use Development
New Construction, Infrastructure, Alteration - 86,550 SF
Design
Los Angeles, CA 91405

Folsom Boulevard Complete Streets Phase 1
Infrastructure
Bidding
$5,400,000 est. value
Sacramento, CA

Tenaya Middle School Office and Site Walk Improvements
Infrastructure
Bidding
$405,000 est. value
Fresno, CA 93711

De Anza Park Pathway Renovation
Infrastructure
Post-Bid
$546,000 est. value
Sunnyvale, CA 94087

2021 Pavement Rehabilitation
Alteration
Post-Bid
$500,000 est. value
Ross, CA 94957

Removal and Replacement of Concrete within the Public Right-Of-Way
Infrastructure
Results
San Jose, CA

Marin County Jail Booking Area Barrier Removal for ADA Compliance
Infrastructure
Results
$159,249 est. value
San Rafael, CA 94903

Parking Lot Asphalt Repair, Sealing and Striping at the Pleasanton Department of Motor Vehicles Field Office
Infrastructure
Bidding
Pleasanton, CA 94588

Master As-Needed Agreement M14 Curb Ramp Construction
Infrastructure
Post-Bid
$1,000,000 est. value
San Francisco, CA

Fancher Creek Trail
Infrastructure
Results
$669,877 est. value
CA

Better Market Street - Phase 1
Infrastructure
Bidding
$24,000,000 est. value
San Francisco, CA 94158

Parking Pay Station Site Improvements Lot J
Infrastructure
Post-Bid
$20,000 est. value
Rohnert Park, CA 94928

2020-21 Community Development Block Grant Project
Infrastructure
Results
$1,800,000 est. value
San Mateo, CA

Turtle Rock Community Park Parking Lot Rehabilitation
Infrastructure
Bidding
$680,000 est. value
Irvine, CA 92606

Colima Road Rehabilitation
Infrastructure
Post-Bid
$6,400,000 est. value
Whittier, CA 90603

Last Updated 11/01/2021 02:15 PM
Project Title

Construction - 2020 Pedestrian and Surfacing Improvements

Physical Address View project details and contacts
City, State (County) Santa Rosa, CA 95403   (Sonoma County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,015,945
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done consists of installation of a pedestrian hybrid beacon system and replacement of pedestrian curb ramps at the intersection of Old Redwood Highway and Lark Center Drive, removal and replacement of asphalt concrete surfacing on Chico Avenue, and placement of an asphalt concrete overlay on Price Avenue together with associated flagging, traffic control and preparation required to construct the work, repairing pavement structural section, cold planning, and such other items

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents